期刊文献+

城市轨道交通乘务排班工作中的混合班制方案 被引量:4

Mixed Class Scheme in Urban Rail Transit Crew Scheduling
在线阅读 下载PDF
导出
摘要 基于四班二运转乘务排班方案,提出了将车队错班复合的混合班制方案,详细说明了混合班制方案的排班思路,介绍了公共序号、常态序号及人员配比等重要参数的计算确定。基于上海轨道交通12号线的现场实际数据进行分析,阐述了混合班制方案在组织管理和经济效益方面的优越性,分析了混合班制方案广泛的适用性。 Based on the four-shift and two-operation crew scheduling mode,a mixed-shift system with mixed-operation for crew scheduling is proposed,and important parameters like the public serial number,normal serial number and personnel ration are calculated.Based on an analysis of the on-site field data obtained from Shanghai rail transit Line 12,advantages of the mixed class scheme in organization,management and economic benefits are expounded,the wide applicability of which is further analyzed.
作者 张德超 刘志钢 潘寒川 沈世昉 ZHANG Dechao;LIU Zhigang;PANG Hanchuan;SHEN Shifang(College of Urban Rail Transit,Shanghai University of Engineering Science,201620,Shanghai,China;不详)
出处 《城市轨道交通研究》 北大核心 2020年第8期201-205,共5页 Urban Mass Transit
基金 “十三五”国家重点研发计划子课题(2016YFC0802500) 国家科技支撑计划项目子课题(2015BAG19B02-28)。
关键词 城市轨道交通 混合班制 乘务排班 人员优化 urban rail transit mixed class crew scheduling staff optimization
作者简介 第一作者:张德超,硕士研究生。
  • 相关文献

参考文献7

二级参考文献34

  • 1赵鹏,姚凤金,张洪亮.综合调度仿真系统中的机车乘务计划的编制[J].铁道运输与经济,2005,27(3):74-76. 被引量:8
  • 2李献忠,徐瑞华.基于时间耗费的城市轨道交通乘务排班优化[J].铁道学报,2007,29(1):21-25. 被引量:26
  • 3Tallys H Yunes,Amaldo V Moura,Cid C De Souza.Hybrid column generation approaches for urban transit crew management problems[J].Transportation Science, 2005,39(2) : 273-288.
  • 4Martin Desrochers,Francois Soumis. A column generation approach to the urban transit crew scheduling problem [J].Transportation Science, 1989,23(1): 1-13.
  • 5沈吟东,倪郁东.列生成法及其在大规模驾驶员调度系统中的应用[A].Proceedings of the 27th Chinese Control Conference[C].2008.
  • 6Jean Y B.The HASTUS vehicle and manpower scheduling system at the S.T.C.U.M[J].Interface,1990,20(1):258.
  • 7Ball M.A matching based heuristic for scheduling mass transit crew and vehicles[J].Transportation Sci,1983,17(1):1427.
  • 8Kotecha K,Sanghani G,Gambhava N.Genetic algorithm for airline crew scheduling problem using cost-based uniform crossover[J].Lecture Notes in Computer Science,2004,3285(2):84.
  • 9Brucker P,Knust S.Resource-constrained project scheduling and timetabling[J].Lecture Notes in Computer Science,2001,2079(1):277.
  • 10Boschetti M A,Mingozzi A,Ricciardelli S.An exact algorithm for the simplified multiple depot crew scheduling problem[J].Annals of Operations Research,1998,1271(4):177.

共引文献44

同被引文献22

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部