期刊文献+

堆载预压和预应力管桩联合处理软土地基方法 被引量:1

Preliminary study on the method of combined treatment of soft soil foundation with preloading and prestressing pipe pile
在线阅读 下载PDF
导出
摘要 采用堆载预压和预应力管桩联合处理软土地基的方法,并结合浙江省温州市甬台温高速公路软基处理项目对其处理效果进行评价。结果表明该技术能够较好的控制软土地基的总沉降及工后沉降,降低软土地基处理的造价。 In this paper, preloading and prestressing pipe piles are used to treat the soft soil foundation, and the treatment effect is evaluated in combination with the soft foundation treatment project of an expressway in wenzhou city, zhejiang province. The results show that the technology can control the total settlement and the settlement after construction and reduce the cost of the treatment of soft soil foundation.
作者 乔颖 田勋 田中亚 QIAO Ying;TIAN Xun;TIAN Zhong-ya(Hunan Zhongda Testing Technology group Co.,Ltd.,Hunan Changsha 410205 China;Qilu Transportation Development Group Jinan branch,Shandong Jinan 250001 China)
出处 《山东交通科技》 2020年第3期47-49,共3页
关键词 堆载预压 预应力管桩 软土地基 高速公路 preloading prestressed pipe pile soft soil foundation the highway
作者简介 乔颖(1985—),男,湖南长沙人,硕士研究生,工程师,研究方向为公路工程。
  • 相关文献

参考文献2

二级参考文献4

共引文献17

同被引文献5

引证文献1

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部