超长清水混凝土墙外脚手架连墙件分析研究 被引量:9

Analysis of the Scaffold Tie Members Outside of the Ultra-long Fair-faced Concrete Wall
在线阅读 下载PDF
导出
摘要 港珠澳大桥珠海口岸工程清水混凝土工程体量大,单面墙体长度长、高度高,而本工程外脚手架采用落地式钢管脚手架。根据规范要求,钢管脚手架连墙件必将出现在清水混凝土外墙上,但若连墙件设计不当,将直接导致脚手架失稳或清水混凝土墙饰面效果达不到要求。通过三维设计与现场模拟试验,研制一种新型清水混凝土墙外脚手架连墙件,保证脚手架不发生倾覆的同时也达到清水混凝土墙饰面效果。 The construction of fair-faced concrete of the Zhuhai Port of Hong Kong-Zhuhai-Macao Bridge has a large volume and a long wall. The scaffold of this project adopts the steel tubular scaffold with couplers. According to the requirements of the code,the tie members shall be placed on the fair-faced concrete wall. However,if the tie members are not set properly,it will directly affect the instability of the scaffold or the decorative effect of the fair-faced concrete wall and cannot meet the requirements. In this paper,through three-dimensional design and field simulation experiment, a new type of scaffold connected with the wall outside the fair-faced concrete wall is developed to ensure that the scaffold does not occur transverse bending instability or overturning,and at the same time achieves the effect of fairfaced concrete wall finish.
作者 黄后玉 李书文 莫坚华 徐书佳 楚洲 HUANG Houyu;LI Shuwen;MO Jianhua;XU Shujia;CHU Zhou(Guangxi Construction Engineering Group No.5 Construction Engineering Co.,Ltd.,Liuzhou,Guangxi 545000,China)
出处 《施工技术》 CAS 2020年第8期104-106,共3页 Construction Technology
关键词 清水混凝土 脚手架 连墙件 试验 fair-faced concrete scaffolds tie members testing
作者简介 黄后玉,工程师,E-mail:1047504108@qq.com。