摘要
在油藏开发之前,为研究油藏类型、油藏边界、极限生产能力,进一步录取不同生产制度下的温度、压力、产量及气油比等资料,求取该井的最高极限产能,需要对油藏进行系统试井。本文以某油藏为例,针对该地区油藏高温、高压和高产的技术难点,探讨一种新型的系统试产工艺,以期可以给同行提供一定借鉴。
Before the development of the reservoir,in order to study the type of reservoir,the boundary of the reservoir,and the maximum production capacity,further obtain the data such as temperature,pressure,production,and gas-oil ratio under different production systems to determine the maximum limit production capacity of the well,the reservoir need be tested systematically.In this article,taking an oil reservoir as an example,aiming at the technical difficulties of high temperature,high pressure,and high production in this area,a new type of well test process was discussed.
作者
陈超峰
李学斌
周光
安羽龙
李思洋
CHEN Chao-feng;LI Xue-bin;ZHOU Guang;AN Yu-long;LI Si-yang(PetroChina Xinjiang Oilfield Company Exploration Division,Xinjiang Karamay 834000,China;Yangtze University,Hubei Wuhan 430100,China)
出处
《辽宁化工》
CAS
2020年第3期270-272,共3页
Liaoning Chemical Industry
关键词
三高油井
试井工艺技术
措施
high-temperature,high-pressure and high-production wells
well testing technology
measures
作者简介
陈超峰(1971-),男,高级工程师,研究方向:从事油气勘探研究工作;通讯作者:李思洋(1996-),男,长江大学研究生在读,研究方向:井眼轨迹不确定性。