                    林州市第二污水处理厂结合厂址处的自然地势落差和景观要求,采用全地下和半地下相结合的“窑洞式”建设方案,实现了土地节约型、环境友好型的建设目标,同时还能够降低检修层的消防要求,实现箱体部分区域的自然进风,达到节能降耗的目的,可为其他类似项目提供借鉴。污水处理采用“改良型A^2/O+高效沉淀池+纤维转盘滤池+紫外线消毒”工艺,所有污水和污泥处理建(构)筑物集成布置在一个地下两层的箱体内,实现集约化布局。箱体采用超长结构无缝设计,内部设有除臭系统、通风系统、消防和疏散系统、供电和照明系统、监控系统等配套设施。
                
                Based on the topography condition and the landscape requirement,the goal of land saving and environment friendly construction was realized by application of the“cave-style”construction scheme in Linzhou City second sewage treatment plant,which integrated the underground and the semiunderground construction mode.Moreover,the“cave-style”construction scheme could also reduce the fire protection requirement of maintenance layer.Consequently,the partial region of the sewage treatment plant box body could realize natural ventilation,which achieved the goal of energy-saving and costreducing.Therefore,the construction scheme of Linzhou City second sewage treatment plant could provide reference for similar projects.The sewage treatment process was“improved A^2/O+highefficiency settler+fiber rotary table filter+UV disinfection”.All structures for wastewater and sludge treatment were settled in a two-floor underground box structure concentratedly,which realized the intensive layout.The box body used the super long structure with seamless design,with several ancillary facilities including deodorization system,ventilating system,fire and evacuation system,power supply and lighting system,monitoring system,etc.
    
    
                作者
                    崔全喜
                    孙高升
                    马亚平
                    杨涛
                    尹卫红
                CUI Quan-xi;SUN Gao-sheng;MA Ya-ping;YANG Tao;YIN Wei-hong(Henan Urban Planning and Design Research Institute Co.Ltd.,Zhengzhou 450044,China)
     
    
    
                出处
                
                    《中国给水排水》
                        
                                CAS
                                CSCD
                                北大核心
                        
                    
                        2020年第4期57-61,共5页
                    
                
                    China Water & Wastewater
     
    
    
    
                作者简介
崔全喜(1982-),男,河南驻马店人,大学本科,高级工程师,分院总工程师,注册公用设备工程师,注册咨询工程师,主要从事市政给排水工程的规划、咨询、设计工作,获得国家优秀勘察设计三等奖3项,河南省建设标准设计一等奖1项、优秀勘察设计奖18项(一等奖7项)、优秀工程咨询奖14项(一等奖5项)、优秀规划奖2项,被评为“2014年度郑州市优秀勘察设计师”。E-mail:8647577@qq.com。