摘要
高速铁路事业持续发展之下,连续梁桥技术水平持续提升,但遇到大规模连续梁桥施工时,容易受到工期与资源调配的影响,明显区别于单一桥梁工程。论文从实际工程出发,针对其中的多处连续梁(刚构)桥施工展开探讨,总结技术难点,提出可行的施工管理策略。
With the continuous development of high-speed railway, continuous girder bridge technology level continues to improve, but in the case of large-scale continuous girder bridge construction, it is easily affected by time limit and resource allocation, which is obviously different from single bridge project. Based on the actual project, this paper discusses the construction of continuous beam(rigid frame)bridge, summarizes the technical difficulties, and puts forward feasible construction management strategies.
作者
李宁
LI Ning(CRCC Hainan Investment Co.Ltd.,Lingshui 572400,China)
出处
《工程建设与设计》
2020年第5期228-229,234,共3页
Construction & Design for Engineering
关键词
高速铁路
连续梁桥
管理策略
high-speed rail
continuous girder bridge
management strategy