高速铁路大量应用连续梁桥的施工管理策略 被引量:1

The Construction Management Strategy for Continuous Beam Bridge Widely Used in High-Speed Railway
在线阅读 下载PDF
导出
摘要 高速铁路事业持续发展之下,连续梁桥技术水平持续提升,但遇到大规模连续梁桥施工时,容易受到工期与资源调配的影响,明显区别于单一桥梁工程。论文从实际工程出发,针对其中的多处连续梁(刚构)桥施工展开探讨,总结技术难点,提出可行的施工管理策略。 With the continuous development of high-speed railway, continuous girder bridge technology level continues to improve, but in the case of large-scale continuous girder bridge construction, it is easily affected by time limit and resource allocation, which is obviously different from single bridge project. Based on the actual project, this paper discusses the construction of continuous beam(rigid frame)bridge, summarizes the technical difficulties, and puts forward feasible construction management strategies.
作者 李宁 LI Ning(CRCC Hainan Investment Co.Ltd.,Lingshui 572400,China)
出处 《工程建设与设计》 2020年第5期228-229,234,共3页 Construction & Design for Engineering
关键词 高速铁路 连续梁桥 管理策略 high-speed rail continuous girder bridge management strategy
作者简介 李宁(1984-),男,四川通江人,工程师,从事施工建设管理研究。
  • 相关文献

参考文献2

二级参考文献3

共引文献6

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部