Dynamic Construction Cost Control Based on Improved Earned Value Analysis Method
在线阅读 下载PDF
导出
摘要 基于挣得值分析法,通过修正费用偏差CV和费用执行指标CPI,细化工作分解结构WBS,引入质量指标综合分析,建立施工成本控制体系。开发施工成本动态控制程序,实现施工成本的动态控制。结合工程案例,实时监控施工进度、成本和质量,分析成本偏差,及时制定纠偏方案,使得施工进度控制在计划工期内、施工质量在较高水平,节省了施工总成本,实现了施工企业经济利益的最大化,展现了动态控制施工成本的可行性和优越性。 Based on the earned value analysis method,the paper revises logical deviation CV and execution cost indicators CPI,detailes work breakdown structure of WBS and introduces the quality indicators,which establishes a comprehensive building construction cost control system. Develops construction cost dynamic control interface,realizes the dynamic control of construction cost. Analyzed and demonstrated with specific cases,monitors construction progress,cost and quality in real time,analyzes cost deviation,and makes corrective plan in time;the construction progress is controlled within the planned construction period and the construction quality is at a good level;the total construction cost is saved,which maximizes the economic benefits of construction enterprises and shows the feasibility and superiority of dynamically controlling construction costs.
作者 陈姣 杨洪娜 杨涛 赵新铭 CHEN Jiao;YANG Hongna;YANG Tao;ZHAO Xinming(Nanjing University of Aeronautics and Astronautics,Nanjing 210016,China;STECOL CORPORATION,Tianjin 300384,China)
出处 《工程经济》 2019年第7期21-25,共5页 ENGINEERING ECONOMY
基金 中国电力建设股份有限公司科技项目(课题)“淤泥质土堤坝工程关键技术研究”(No.DJ-ZDXM-2015-12)
关键词 挣得值分析法 成本控制 动态控制 earned value analysis cost control dynamic control
作者简介 陈姣,女,生于1993年,江苏无锡人,硕士研究生,主要研究方向:结构工程、BIM技术。
  • 相关文献

参考文献2

二级参考文献7

共引文献8

同被引文献13

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部