期刊文献+

掘进巷道地质探放水施工设计与安全措施 被引量:17

Construction Design and Safety Measures of Geological Exploration and Drainage in Tunneling Roadway
在线阅读 下载PDF
导出
摘要 为了保证二采区1202运巷掘进安全,防止巷道掘进期间水害事故发生,潞安集团司马煤业公司地测科决定对1202掘进工作面布置扇形探水钻孔,对其顶板及周围积水进行探放,并在探水施工期间采取了合理有效的安全措施。通过探放水施工后消除了巷道顶板及周边水患影响,有效提高了巷道掘进效率,避免了巷道透水事故发生,取得了显著效果。 In order to ensure the safety of 1202 roadway driving in the second mining area and prevent water damage accidents during roadway driving, the geological survey department of Lu'an Group Sima Coal Industry Company decided to arrange fan-shaped water exploration boreholes on the 1202 roadway driving face, to explore and discharge the roof and surrounding water, and took reasonable and effective safety measures during the water exploration construction. After water exploration and drainage construction, the influence of roof and surrounding water disasters was eliminated, the tunneling efficiency was effectively improved, and the occurrence of water permeation accident was avoided, and significant results were obtained.
作者 王海龙 Wang Hai-long(Lu 'an Group, Sima Coal Co., LTD., Shanxi Changzhi 047105)
出处 《山东煤炭科技》 2019年第2期178-180,共3页 Shandong Coal Science and Technology
关键词 掘进巷道 地质探放水 施工设计 安全措施 tunneling roadway geological explorationand drainage construction design safety measures
作者简介 王海龙(1988-),男,毕业于河北工程大学资源勘 查工程专业,本科,助理工程师,现任潞安集团司马煤业公司地 质测量办公室科员,从事地质防治水技术管理工作。
  • 相关文献

参考文献5

二级参考文献20

共引文献39

同被引文献64

引证文献17

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部