摘要 大坝实测运行性态通过监测设施长期监测获取。为评价某面板堆石坝的实测运行性态,对该大坝变形、渗流、周边缝变形、面板钢筋应力等实测量进行分析,数据分析采用特征值统计、过程线和分布图绘制。通过分析得出如下结论:通过13 a的运行,大坝变形总量不大,目前变形已基本稳定;周边缝三向变形后,周边缝后渗压均不大,周边缝防渗较好;大坝总渗漏量主要受库水位影响,与国内外同级别面板堆石坝相比,大坝渗漏量不大,面板、趾板、帷幕等所组成的防渗体系较好;左岸绕坝渗流不明显,右岸发育张裂缝,存在一定的绕坝渗流;钢筋计应力变化和分布规律符合一般规律,最大压应力小于钢筋强度,且整体处于稳定状态。综合评判该面板堆石坝运行性态良好,相关成果可供其它同类工程借鉴。 The measured operational state of the dam is obtained through long-term monitoring by monitoring facilities.In order to evaluate the actual performance of a concrete face rockfill dam,the deformation,seepage,deformation of the surrounding seam,and the stress of the steel bar are analyzed.The data analysis is drawn by the characteristic value statistics,the process line and the distribution map.According to the analysis of the monitoring results of a high face rockfill dam,the following conclusions are drawn:(1)after 13-year operation,the total deformation of the dam is not huge,and the deformation is basically stable at present.(2)After the three-way deformation of peripheral joints,the seepage pressure of the surrounding joints is small,and the peripheral joints are impervious.(3)The total leakage of the dam is mainly influenced by the reservoir water level.Compared with the same grade face rockfill dam at home and abroad,the leakage of the dam is not large,and the seepage control system,such as the panel,the toe plate and the curtain,is better.(4)The seepage on the left bank is not obvious,and there are cracks in the right bank,and there is a certain seepage around the dam.(5)The variation of stress and distribution law of steel bar conform to the general law.The maximum compressive stress is less than the strength of reinforcing bar,and the whole is in a stable state.This paper comprehensively evaluates that the face rockfill dam has good operation performance,and the relevant results can be used for reference by other similar projects.
作者 肖璐 刘媛媛 张俊嵩 吕高峰 XIAO Lu;LIU Yuanyuan;ZHANG Junsong;LYU Gaofeng(Jiangdu Water Conservancy Project,Yangzhou 225200,China;Hangzhou National Hydropower Project Dam Safety and Emergency Enginering Technical Center Corporation Limited,Hangzhou 311122,China)
出处 《人民珠江》 2019年第2期128-135,共8页 Pearl River
关键词 面板堆石坝 监测 运行性态 变形 渗流 face rockfill dam monitor operational state deformation seepage
作者简介 肖璐,女,主要从事水利工程管理研究。E-mail:lv_gf2@ecidi.com.
  • 相关文献

参考文献7

二级参考文献47

  • 1盛金昌,赵坚,速宝玉.混凝土防渗墙开裂对坝基渗透稳定性的影响[J].水利水电科技进展,2006,26(1):23-26. 被引量:19
  • 2周伟,常晓林,曹艳辉.堆石体流变对分期浇筑的面板变形影响研究[J].岩石力学与工程学报,2006,25(5):1043-1048. 被引量:15
  • 3马洪琪,曹克明.超高面板坝的关键技术问题[C]//中国大坝技术发展水平与工程实例.北京:中国水利水电出版社,2007:52-61.
  • 4中国水电顾问集团贵阳勘测设计研究院.200m级高面板堆石坝技术总结报告[R].贵阳:中国水电顾问集团贵阳勘测设计研究院,2009.
  • 5中国水电顾问集团成都勘测设计研究院.大渡河猴子岩水电站可行性研究报告[R].成都:中国水电顾问集团成都勘测设计研究院,2009.
  • 6欧红光,殷彦高.江坪河水电站面板堆石坝筑坝材料与坝体分区设计[M]//混凝土面板堆石坝筑坝技术与研究.北京:中国水利水电出版社,2005.
  • 7郦能惠.高堆石坝原位观测和反馈分析研究JR].南京:南京水利科学研究院,1995.
  • 8彭育,陈振文.滩坑水电站混凝土面板堆石坝施工期坝体变形特征[C]//土石坝技术2008年论文集.北京:中国电力出版社,2008.
  • 9云南华昆水电水利科学研究有限公司.云南盘龙河马鹿塘二期工程大坝监测2009年度总结报告[R].昆明:云南华昆水电水利科学研究有限公司,2009.
  • 10湛正刚,等.董菁水电站面板堆石坝运行状态初步分析[R].贵阳:中国水电顾问集团贵阳勘测设计研究院,2010.

共引文献85

同被引文献42

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部