玉龙喀什水利枢纽工程高趾墩混凝土面板堆石坝渗控设计及三维渗流分析 被引量:5

Seepage control design and 3D seepage analysis of high toe pier concrete face rockfill dam of the Yulong kashi Hydro Junction Project
在线阅读 下载PDF
导出
摘要 玉龙混凝土面板堆石坝位于狭窄河谷,并且坝址河床砂卵砾石层渗透性强,抗渗稳定性差。该工程采用帷幕灌浆、高趾墩、混凝土面板组成坝体防渗系统,最大坝高230.5m,这种混合式超高面板堆石坝在国内外已属罕见。按照规范要求对堆石坝料进行分区、及坝基进行处理并采用,再通过进行三维渗流有限元计算,全面、完整地掌握大坝各分区渗流场状况。结果表明:校核水位渗流场水头分布规律合理,总水头等值线在面板、趾板、高趾墙、帷幕等处较为密集,上游水头由这些部位承担,渗控系统起到了很好的防渗效果。表明此次对坝料分区、及坝基处理较为合理,混凝土面板、垫层料、花岗岩爆破料最大渗透坡降均小于破坏水力坡降,设置帷幕可以使两坝肩渗漏量很小,绕坝渗流并不明显,受到右岸单薄山梁影响,右岸渗漏量最大但也满足渗漏要求,表明这种混合式防渗系统的防渗效果明显。依此,为今后类似工程提供借鉴。 The Yulong concrete face rockfill dam is located in a narrow river valley with strong permeability and poor impermeability.The dam is composed of curtain grouting,high toe pier and concrete face slab.The maximum dam height is 230.5 m.This kind of concrete type super high face rockfill dam is rare at home and abroad. According to the requirements of the code,the rockfill dam materials are zoned,and the dam foundation is treated and adopted.Then,through the three-dimensional seepage finite element calculation,the seepage field of each zoning of the dam can be fully and completely grasped.The results show that the head distribution of the seepage field is reasonable.The total head contours are dense in the face slab,toe slab,high toe wall and curtain.The upstream head is assumed by these parts.The seepage control system has a good effect on seepage control.The results show that the zoning of dam material and the treatment of dam foundation are reasonable.The maximum seepage gradient of concrete face slab,cushion material and granite blasting material is smaller than the hydraulic gradient of failure.The curtain can make the seepage of both abutments very small,the seepage around the dam is not obvious,and is affected by the thin mountain beam on the right bank.The seepage control effect of the mixed type seepage control system is obvious.It will provide reference for similar projects in the future.
作者 郭宇 朱银邦 崔炜 吴俊杰 Guo Yu;Zhu Yingbang;Cui Wei;Wu Junjie
出处 《吉林水利》 2018年第12期12-16,共5页 Jilin Water Resources
关键词 混合式超高面板堆石坝 高趾墩 渗流场 渗控系统 Hybrid super high concrete face rockfill dam high toe pier seepage field seepage control system
作者简介 郭宇(1980-),男,新疆乌鲁木齐人,硕士、高级工程师,研究方向水工结构设计。
  • 相关文献

参考文献7

二级参考文献18

  • 1华静,杨华舒,念红芬.病险土石坝防渗治理措施探析[J].云南水力发电,2005,21(4):21-23. 被引量:12
  • 2马福恒,向衍,吴中如.水工混凝土结构健康诊断的预警系统[J].水利水运工程学报,2005(3):7-12. 被引量:16
  • 3速宝玉,沈振中,赵坚.用变分不等式理论求解渗流问题的截止负压法[J].水利学报,1996,28(3):22-29. 被引量:68
  • 4王勋成,邵敏.有限单元法基本原理与数值方法[M].北京:清华大学出版社,1988.
  • 5盛金保,李雷.混凝土面板坝渗流分析方法初探[M].南京:南京水利科学研究院,2000.
  • 6毛昶熙等.堤坝防渗与防冲[M].北京:中国水利水电出版社.2003.
  • 7龚晓南.地基处理手册.(第三版)[M].中国建筑工业出版社,2008,6.
  • 8石根华.数值流形方法与非连续变形分析[M].北京:清华大学出版社,1997..
  • 9祁庆和.水工建筑物[M].北京:中国水利水电出版社,1996.500-503.
  • 10马福恒.病险水库大坝风险分析与预警方法[R].南京:河海大学,2006.

共引文献80

同被引文献49

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部