摘要
通过对手掘式顶管的设计、施工的关键点进行了说明,着重强调了在设计中要对钢筋混凝土套管进行校核、验算,在施工过程中要做好测量、纠偏校正和地面沉降监测工作,为今后管道建设中的手掘式顶管穿越提供了一定理论基础和相关经验。
In this paper,the key points of the design and construction of hand-driven pipe jacking were explained and specified.It was emphasized that the reinforced concrete casings should be calculated and verified in the design.During the construction process,the surveying,rectifying and correction and land subsidence monitoring should be emphasized in construction.It provides a theoretical basis and experiences for the hand driven jacking and penetration in the future pipeline constructions.
作者
蒋艳红
庞保华
李丽鹏
张韬
王坚
Yanhong Jiang;Baohua Pang;Lipeng Li;Tao Zhang;Jian Wang(No.4 Branch Company of China Petroleum Pipeline Engineering Co.Ltd.,Langfang Hebei;Design Branch Company of China Petroleum Pipeline Engineering Co.Ltd.,Langfang Hebei)
出处
《石油天然气学报》
CAS
2018年第3期40-45,共6页
Journal of Oil and Gas Technology
关键词
顶管
钢筋混凝土套管
操作坑
接收坑
顶铁
导轨
Pipe Jacking
Reinforced Concrete Casing
Operation Pit
Receiving Pit
Top Iron
Guide Rail
作者简介
蒋艳红(1982-),女,工程师,现主要从事石油管道施工技术管理工作,Email:gd4jiangyanhong@cnpc.com.cn。