摘要
介绍了福建云霄某风电场110kV GIS的安装调试过程及质量计划,为今后110 kV GIS安装调试工程提供借鉴和参考。
This paper introduces the installation and debugging process and precautions of 110kV GIS in a wind farm in Yunxiao,Fujian Province,and provides reference and reference for the future installation and commissioning of 110kV GIS.
作者
郜秋凯
GAO Qiu-kai(The Fifth Research And Design Institute Of Nuclear Industry,Zhengzhou Henan 450000,China)
出处
《科技视界》
2018年第6期121-122,共2页
Science & Technology Vision