摘要
由于礁石、海上交通或海难的限制,规划的潮汐流场内存在障碍区域,这些障碍区域影响电缆的拓扑,现有的方法大部分没有充分考虑障碍区域对拓扑设计的影响,为此,文章提出一种考虑障碍区域的潮汐流场集电系统规划方法。该方法协调了障碍区域与电缆拓扑之间的关系,得到更接近实际环境的规划方案。首先,引入改进的辐射形分组方法,有效减少优化变量;之后考虑障碍区域的影响,建立含障碍区域的集电系统规划模型;然后结合混合整数规划方法对模型进行高效求解;最后,结合仿真算例,验证文章方法的有效性。
Due to the limitations of reefs, maritime traffic or shipwrecks, there are barrier areas in the planned tidal flow field, which affect the topology of the cable. Most of the existing methods do not fully take into account the impact of the barrier areas on the topology design, and for this reason, this paper puts forward a method for the planning of tidal current collecting system consider-ing the obstacle area, which harmonizes the relationship between the obstacle area and the cable topology, and gets the planning scheme which is closer to the actual environment. Firstly, the improved radiometric grouping method is introduced to reduce the opti-mal variables effectively. Then, considering the influence of the obstacle region, the system planning model is established, and then the mixed integer programming method is used to solve the model efficiently. Finally, the effectiveness of the proposed method is verified by a simulation example.
出处
《科技创新与应用》
2018年第12期144-145,共2页
Technology Innovation and Application
关键词
障碍区域
集电系统规划
辐射形分组
obstacle area
collector system planning
radiometric grouping
作者简介
王元萌(1991,07-),男,山东泰安,硕士研究生,研究方向:潮汐流场规划与运行.