以磁窑沟煤矿10201综采工作面过断层为工程背景,为防止工作面出现初采期间运输机上窜下移、局部顶板破碎和漏顶等问题,采取了工作面调斜、顺槽揭露断层处顶板补强支护、工作面矸石区域放松动炮、优化生产组织等措施最终顺利通过了该断层。
Taking the fault going through background, in order to prevent the fluctuation mining, measures to adjusting the head and tail of 10101 coal of scraper, the of the scraper, mining face in Ciyugou coal mine as the engineering fracture and collapse of some part of roof during reinforcement of the roof at the fault site, releasing the fault by blasting and optimizing the production organization are carried out, by which ensured the smooth passing of the fault.
出处
《山西焦煤科技》
2017年第12期37-39,共3页
Shanxi Coking Coal Science & Technology
关键词
过断层
漏顶
调斜
放松动炮
补强支护
Passing through fault
Roof collapsed
Adjusting the scraper head and tail
Blasting for loosening
Reinforcement support