摘要
同卡水电站是怒江上游水电规划的第5梯级,其移民人数占整个怒江上游水电开发(推荐方案)移民人数的40%,淹没耕地面积占43%。做好同卡水电站的移民安置工作是怒江上游的移民安置工作的顺利实施和怒江上游水电开发有序开展的有力保证。但同卡水电站建设征地区耕地资源匮乏,基础设施落后,生态环境十分脆弱,宗教氛围浓厚,收入来源单一。文章立足建设征地区的实际情况,提出了推荐的移民生产安置方案,对移民安置效果进行了初步的定性预测。
Tongka Hydropower Project is the 5th cascade one in the hydropower development planning of the upstream of the Nujiang riv-er. Its population resettlement accounts for 40% the total one for the hydropower development (in the recommended scheme) at the up-stream of the river. The farmland to be inundated by the project accounts for 43% the total one to be inundated by projects development. To well handle the population resettlement,it is a strong guarantee for the successful population resettlement and the hydropower develop-ment at the upstream Nujiang river in order. But, in the land acquisition area for construction of Tongka Hydropower Project, the farm-land is insufficient, the infrastructure is backward, the ecological environment is quite vulnerable, and the religious atmosphere is rich, the income source is simple. Based on the actual situation of the land acquisition area, in the paper, scheme for population resettlementand production is recommended. Effect of the population resettlement is predicted qualitatively.
出处
《西北水电》
2017年第6期10-14,共5页
Northwest Hydropower
关键词
移民
建设征地
逐年补偿
以土安置
population resettlement
land acquisition for construction
yearly compensation
resettlement based on land availability
作者简介
荆树猛(1984-),男,河南省新乡县人,工程师,从事水利水电工程移民工作.