摘要
结合阳煤集团新景矿长距离掘进工作面,通过理论计算,对其供电进行了选型设计。该设计选型结果在8304工作面的成功应用,满足了掘进期间对大功率设备对长距离供电安全和可靠性的要求,为实现高效安全掘进提供了保障,可以在相同条件巷道进行推广应用。
The new distance drivage face power supply is designed through calculating, and the application of success in 8304 working face meets the driving period of high power equipment for long distance safety and reliability of power supply, provides guarantee for the realization of efficient and safe driving, which can be applied in the same conditions of roadway.
出处
《机械管理开发》
2017年第7期96-98,共3页
Mechanical Management and Development
关键词
长距离
掘进工作面
供电设计
long distance driving
face
tunneling working face
power supply design