摘要
年楚河现状左岸堤防护坡多数为干砌石结构,岸坡稳定性较差,难以起到有效防护作用。文中通过护坡、护脚方案优选及弯道工程措施的选择,最终确定采用铅丝笼干砌石护坡、钢筋笼砌石护脚及丁坝弯道防护,作为年楚河干流左岸防洪堤整治工程的设计方案。
At present,the embankment at the left dike of Nianchuhe river are almost the dry stone structure,the stability of slope is poor,which is difficult to play an effective protective role.Through the optimization of slope protection and foot protection and the selection of bend engineering measures,the paper determines the design scheme of the flood control dike regulation project at the left bank in the main stream of Nianchuhe river,with the gabion dry stone slope protection and the steel reinforcement cage foot protection and the spur dike bend protection.
出处
《东北水利水电》
2017年第5期3-5,共3页
Water Resources & Hydropower of Northeast China
关键词
堤防整治工程
设计方案
年楚河干流
dike regulation project
design scheme
main stream of Nianchuhe river