摘要 由于对地上和地下空间的整体开发应用越来越多,大多基坑项目与已经建设竣工的地铁或隧道相邻,因此,基坑项目和地下隧道间的问题越来越明显,已经是当前城市建设迫切需要解决的问题。论文在现有的探索结果上,剖析了基坑项目开挖的现状及不足,以及对邻近地铁和隧道的影响,并剖析它的解决方案,希望能给相关工作人员给予理论和实践方面的帮助。 Because of the owraU development and application of ground and underground space more and more, there were more excavation project has adjacent to the completed construction of the subway or tunnel, the problems of excavation project and underground tunnel become more and more obvious, has been a urgent problem need to be solved in the city construction. Based on the existing exploration results, this paper analyses the current situation and problems of foundation excavation, and its affects on the adjacent subway and tunnel, then find out its solution, hoping to give theory and practical help to relevant workers.
作者 翟大明 ZHAI Da-ming(Beijing Railway International Tendering Co. Ltd., Beijing 100143, China)
出处 《工程建设与设计》 2017年第2期28-29,共2页 Construction & Design for Engineering
关键词 基坑开挖 紧邻地铁隧道 力学响应 处理方案 foundation excavation adjacent to the subway tunnel mechanical response processing program
作者简介 翟大明(1984~),男,北京人,工程师,从事隧道工程施工技术研究。
  • 相关文献

参考文献2

二级参考文献12

共引文献183

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部