回顾了现代轨道装备维修体制的发展历程,对动车组维修体制的现状及存在的不足进行了阐述,指出计划预防修存在维修不足、过度维修、次生灾害风险高、维修成本高的弊端,分析了我国动车组开展视情维修的可行性并对此进行了论证,绘制了动车组维修逻辑决断流程图,提出了动车组修程修制的优化建议。
The development of modern railway equipment maintenance system was reviewed, detailed in the current condition and defects of EMU maintenance system, and the disadvantages of periodic maintenance such as insufficient repair, excessive repair, high risk of secondary disasters, and high cost of maintenance were pointed out. Then, the application of condition based maintenance(CBM) in EMU was analyzed and demonstrated. Lastly, the logic decision flow chart of EMU maintenance was proposed and the development trends of EMU maintenance system in the future were prospected.
出处
《机车电传动》
北大核心
2017年第1期17-21,共5页
Electric Drive for Locomotives
基金
中国铁路总公司科技研究开发计划课题(2016J007-B)
关键词
动车组
修程修制
视情维修
计划预防修
EMU
repair class and repair system
condition based maintenance(CBM)
periodic maintenance
作者简介
周斌(1986-),男,工程师,从事动车组故障预测与健康管理(PHM)及运维决策系统研究。