摘要 21世纪初以来,中国滨海核电机组数量不断增多,滨海软基处理已成为滨海核电站建设面临的共性问题。某滨海核电厂为了有效解决其取水明渠防波堤滨海软基处理问题,通过技术论证和经济性分析,最终选用了插排水板堆载预压技术进行地基处理。该地基处理技术在分层堆载预压时软基的固结情况与设计基本相符,经过施工期和完工后长时间的沉降观测,沉降基本趋于稳定,插排水板堆载预压软基处理技术在此项目中的应用取得了成功,是一种经济可靠的软基处理技术,为后续滨海核电厂软基处理提供了宝贵的工程经验。 According to the development of coastal nuclear plants in the 21st century, the coastal foundation treatment has been the main problem to the coastal nuclear plant construction. A coastal nuclear plant built a water intake channel on Dajin island. To ensure the rationality of technology and economy, and solve the stability problems of the coastal soft foundation, the project finally used the plastic drainage plate combined with surcharge preloading technology. After the construction period and a long time observation, the settlement is basically stable, the foundation treatment technology in the application of this project has been proved successful. And provides a valuable experience to the coastal foundation treatment.
作者 谭南柏 王谦
出处 《南方能源建设》 2016年第3期100-103,111,共5页 Southern Energy Construction
关键词 插排水板 分级加载 静载期 沉降观测 plastic drainage plate step loading dead load stage settlement observation
作者简介 谭南柏(1987),男,汉族,湖南柿州人,工程师,学士,主要从事核电工程设计管理工作(e-mail)tannanbo@cgiipc.com.
  • 相关文献

参考文献9

二级参考文献6

  • 1控制加载爆炸挤淤置换法:中国专利.CN03119314.5[P].
  • 2JTJ/T258-1998,爆炸法处理水下地基和基础技术规程[S].
  • 3王健 江礼茂 刘伟庆.阳江核电海工一期东平台防护堤爆炸处理软基施工组织设计[R].北京:北京中科力爆炸技术工程有限公司,2004..
  • 4《工程地魇手册》编写组.工程地质手册[M].北京:中国建筑工业出版社,1975..
  • 5江礼茂 吴京平 王健.爆炸处理软基筑堤的设计与施工[R].北京:北京中科力爆炸技术工程有限公司,2002..
  • 6陶松垒,李未材.防波堤基础的爆炸处理方法及应用[J].爆炸与冲击,2003,23(5):475-480. 被引量:8