期刊文献+

地铁站深基坑逆作法施工过程地下室结构与毗邻基础的相互影响 被引量:2

Interaction of Basement Structure and Surrounding Building Foundation during Deep Metro Station Excavation by Top-Down Method
在线阅读 下载PDF
导出
摘要 在反演分析得到的参数基础上研究地铁站基坑逆作法施工过程中基坑地下室结构与临近桩基础和浅基础的相互影响.当基坑周边有浅基础时,当其他条件相同时,随着浅基础与基坑的距离增加、基础埋深增加、基础宽度增加,基坑开挖引起的浅基础中心点的沉降量逐渐减小;随着浅基础埋深增加,浅基础与基坑距离增加,开挖引起的挡土墙和桩柱上部(0~28 m)侧移减小;浅基础宽度变化对挡土墙和桩柱侧移影响不大.当基坑周边有桩基础时,当桩基础与挡土墙之间的距离相同时,桩长越长,桩基础受到基坑开挖导致的土体回弹影响越大;桩基础的存在对挡土墙的墙身侧移影响很小;在浅基础及桩基础各工况中,开挖引起的坑内桩柱及挡土墙的回弹十分接近,开挖引起的挡土墙土压力沿深度分布也十分接近. The top-down excavation of Metro Line 10 in Shanghai is modeled with finite element analysis soft ware ABAQUS , and the parameters of subsoil are obtained by inverse analysis. Based on the finite elementmodels and parameters, interaction of basement structure and surrounding building foundations during topdownexcavation is discussed in detail. If the shallow foundation is close to the pit,settlement at the middle ofshallow foundation is decreased when the distance between shallow foundation and pit, the burying depth ofshallow foundation and the width of shallow foundations is increased. W h e n burying depth of the shallow foundationand the distance between shallow foundation and pit are increased, the deflection caused by pit excavationalong top part of the diaphragm wall, column and pile £ire decreased. Deflections of the diaphragm wall,column and pile do not change with the shallow foundation width . If pile foundation is close to the pit, thelonger pile length results in the greater effect of soil rebound on pile foundations. Effect of pile foundation ondiaphragm wall deflections can be neglected,and the deflection of diaphragm wall does not change with pilelength. In all cases of pile and shallow foundations, rebounds of inner column and diaphragm wall £ire veryclose, and so does the soil pressure along diaphragm wall.
出处 《大连交通大学学报》 CAS 2016年第4期85-90,117,共7页 Journal of Dalian Jiaotong University
基金 国家自然科学基金资助项目(51208071)
关键词 逆作法 浅基础 桩基础 地下连续墙 地铁站深基坑 top-down method shallow foundation pile foundation diaphragm wall deep metro station excavation
作者简介 王丽(1974-),女,副教授,博士,主要从事岩土工程领域的科研和教学工作的研究 E-mail:jiaoda_tina@163.com.
  • 相关文献

参考文献19

二级参考文献57

共引文献262

同被引文献4

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部