摘要 朔黄铁路某(8+16+8)桥钢筋混凝土梁的状态较差,钢筋锈蚀和混凝土剥落严重,耐久性问题突出,不能保证桥梁处于正常运营状态。本文结合朔黄铁路开行大轴重重载列车的需求,对该桥梁的加固改造方案进行研究,并建议采用增大截面或梁体置换法对跨度8 m钢筋混凝土T梁进行加固改造,采用辅助钢梁法对跨度16 m超低高度预应力混凝土T梁进行加固。 A 3-span ( 8 +16 +8) m defected reinforced concrete bridge in Shuozhou-Huanghuagang railway,with severe steel rusting and concrete spalling,was studied in this paper. Its existed damage and weakened durability threatened the normal operation. On the other hand,heavy haul railway was planned for the line in the future. Given the actual state of the bridge with damage and the pending heavy axle loads,the strengthening program was studied. The 8 m reinforced concrete Tgirder was suggested to be strengthened through larger profile or girder replacement while the 16 m extremely shallow prestressed concrete Tgirder was strengthened with auxiliary steel girder.
作者 李保龙
出处 《铁道建筑》 北大核心 2016年第4期22-25,34,共5页 Railway Engineering
关键词 钢筋锈蚀 疲劳 加固 换梁 Steel rusting Fatigue Strengthening Girder replacem ent
作者简介 李保龙(1979-),男,工程师,硕士。
  • 相关文献

参考文献8

二级参考文献34

  • 1王振华.我国铁路预应力混凝土桥梁及标准设计的发展[J].铁道标准设计,2004,24(7):149-158. 被引量:9
  • 2.TB10002.3.铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].,..
  • 3铁科院铁建所.京通线预应力混凝土梁试验评估报告[R].,2003(6)..
  • 4TB10002.3.铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].[S].,..
  • 5中华人民共和国铁道部.铁路桥涵设计基本规范[S].北京:中国铁道出版社,2005
  • 6中华人民共和国铁道部.铁运函[2004]120号铁路桥梁检定规范[S].北京:中国铁道出版社,2004.
  • 7中国铁道科学研究院铁道建筑研究所.重载铁路发展趋势及关键技术深化研究报告[R].北京:中国铁道科学研究院铁道建筑研究所,2011.
  • 8中国铁道科学研究院铁道建筑研究所.新建煤运通道设计荷载标准及相关参数研究报告[R].北京:中国铁道科学研究院铁道建筑研究所,2011.
  • 9中国铁道科学研究院铁道建筑研究所.客货分线后线桥隧适应货运重载关键技术及相关运输模式研究报告[R].北京:中国铁道科学研究院铁道建筑研究所,2011.
  • 10牛斌,胡所亭,魏峰,等.重载铁路桥梁评估与加固技术[C]//第十九届全国桥梁学术会议论文集.北京:人民交通出版社,2010.