基于改进LEC法的水利施工现场危险源识别及防控对策 被引量:7

Hazard source identification and relative prevention and control measures at water conservancy construction site based on LEC method improving
在线阅读 下载PDF
导出
摘要 水利工程建设施工环境较为复杂,施工现场危险源种类繁多并对水利工程的现场作业造成严重威胁。本文在综合分析水利施工现场危险源构成因素基础上,探讨了施工现场危险源识别原则。同时,构建了基于改进LEC法的输水工程脚手架搭建施工工序评估指标体系,揭示了该工程施工指标危险性等级,探索了水利施工现场危险源防控对策。研究可为类似工程施工现场危险源识别及风险防控提供决策依据。 The working environment of water conservancy construction is complicated, various kinds of hazard at the construction site can seriously threaten the site work.The study makes a discussion of the principles of hazard source identification on the basis of analyzing the key factors of hazard comprehensively.Meanwhile, it establishes an assessment system of scaffolding working procedure during the water conveyance project based on LEC method improving,which reveals the hazard rank of the project construction indexes and explores the hazard prevention and control measures at water conservancy construction site.The research can provide deci- sion making basis for hazard source identification, risk prevention and control at other similar construction site.
作者 杜妮
出处 《吉林水利》 2016年第4期59-62,共4页 Jilin Water Resources
关键词 水利施工 危险源识别 改进LEC法 脚手架工序 water conservancy construction hazard source identification improve LEC method scaffoldingworking procedure
作者简介 杜妮(1973-),女,汉,辽宁朝阳人,学士,助工,现从事水利工程管理。
  • 相关文献

参考文献8

二级参考文献38

共引文献58

同被引文献28

引证文献7

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部