随着城市轨道交通的发展,线网规模不断扩大,客流量急剧增加的同时也考验车站设备设施的运输通过能力。为了避免车站出现严重拥堵现象,保障乘客出行效率和安全,本文以即将开通的广州地铁6号线二期金峰站为例,通过模拟乘客走行路径,分析车站各关键节点通过能力,得出车站的客流瓶颈,并提出在设备能力有限的情况下车站的应对措施。
With the development of the urban rail transit, the scale of the line is increasing, the passenger flow has increased rapidly, but also test the transport capacity of the station equipment and facilities. In order to avoid serious congestion in the station, guarantee the efficiency and safety of passengers' travel, in the forthcoming opening of the Guangzhou Metro Line 6, the second phase of Jin Feng Station as an example, through simulating the passengers walk's path and analysis the key points of transport capacity, finally draw the station's passenger flow bottleneck, and put forward the corresponding measures.
出处
《科技视界》
2016年第9期6-7,11,共3页
Science & Technology Vision
关键词
6号线二期
金峰站
客流瓶颈
措施
The second phase of Line 6
Jin Feng station
Passenger flow bottleneck
Measure