期刊文献+

新时期建筑施工企业财务成本管理存在的问题与对策 被引量:32

Problems and Countermeasures of Financial Cost Management for Construction Enterprises in the New Period
在线阅读 下载PDF
导出
摘要 当代社会经济发展愈演愈烈,各行各业都在不断的缩减成本扩大效益。建筑市场的竞争也在紧锣密鼓的展开,对于建筑施工企业来说,施工过程中浪费材料、资金不合理占用等状况时有发生,而很多企业到现在都无法解决这些问题。施工企业做好财务成本管理工作是很有必要的,它不仅可以帮助企业做好成本上的合理规划和控制,更加可以调整企业经营的整体效益,让企业可以以最低的成本获得最大的收益。 With the rapid economic development in modern society, all walks of life have been cutting costs and expending benefits. Construction market competition is intense. For construction enterprises, materials waste, unreasonable capital occupation and other problems occur frequently in the process of construction, but many enterprises are not able to solve these problems. To do a good job of financial cost management of construction enterprise is necessary, which can not only help enterprises to make reasonable planning and control, but also adjust the overall effectiveness of enterprises, thus making the enterprise obtain the biggest benefit at the lowest cost.
作者 侯茂珍
出处 《价值工程》 2016年第1期66-69,共4页 Value Engineering
关键词 建筑施工企业 财务成本管理 问题与对策 construction enterprises financial cost management, problems and countermeasures
作者简介 侯茂珍(1969-),女,山西晋中人,毕业于中央广播电视大学会计学专业,本科,研究方向为施工企业成本管理。
  • 相关文献

参考文献5

二级参考文献3

共引文献23

同被引文献65

二级引证文献141

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部