摘要 陈四楼煤矿十六采区辅助胶带巷掘进过程中遇到落差9.5 m正断层,断面大且为白砂岩,严重阻碍了正常的掘进施工。经过现场实践分析和方案对比,优化施工工艺和爆破参数,采用空气柱装药技术,出矸工艺由刮板输送机出矸优化为耙装机+胶带输送机出矸,工效显著提升,安全、高效、快速通过了该断层。 In the process of auxiliary belt roadway drivage in No. 16 mining area of Chensilou Coal Mine, it has exposed normal fault with 9.5 m drops,whose section is large and belongs to white sandstone, and normal construction was seriously hindered. Through prac- tical analysis and scheme comparison, construction technology and blasting parameters were optimized, the technology air column charge was used, too, the former gangue out technics was optimized, rake installed + belt conveyor,instead of the scraper conveyor,were used. The efficiency was significantly increased,and the working face has passed through the fault fast,safely and efficiently.
作者 张明禄
出处 《中州煤炭》 2015年第9期59-62,共4页 Zhongzhou Coal
关键词 大断层 爆破参数 出矸工艺 空气柱装药 large fault blasting parameters process of gangue out air column charge
作者简介 张明禄(1984-),男,山东潍坊人,助理工程师,2012年毕业于太坂理工大学,现从事煤炭开采和瓦斯防治工作。
  • 相关文献

参考文献8

二级参考文献13

共引文献60

同被引文献12

引证文献1

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部