期刊文献+

具有外包选择的无等待流水线干扰修复模型 被引量:6

A Disruption Recovery Model for No-Wait Flow Shop with Outsourcing Option
在线阅读 下载PDF
导出
摘要 针对双机成比例无等待流水线环境下最小化完工时间和的调度问题,研究如何基于干扰管理理论和采用作业外包途径来应对机器干扰事件。在证明最短加工时间优先(SPT)最优解定理的基础上,同时考虑最小化工件完工时间和指标(初始调度目标)与最小化工件滞后时间和指标(偏离最小目标),构建了基于SPT规则的干扰修复0-1整数规划模型,提出了基于差分进化全局搜索策略与"插入-交换"邻域搜索机制相结合的多目标混合智能算法。数值实验结果表明,本文提出的机器干扰条件下外包修复模型及算法是有效的。 We present a novel disruption recovery method based on disruption management and production outsourcing to deal with machine disruptions for the scheduling problem with the scheduling objective of minimizing the sum of completion-time in the case of proportional two-machine no-wait flow shop.By proving the shortest processing time(SPT)rule producing an optimal solution,we build a disruption recovery 0-1integer programming model based on SPT rule,with the objective of minimizing the sum of completion-time(the original objective)and the objective of minimizing the sum of delay-time(departure revising objective),respectively.Combining differential evolution global search strategy and "insert-swap"neighborhood structure based on local search mechanism,we propose a heuristic hybrid multi-objective evolutionary solution algorithm.The numerical experiments show that the production outsourcing based on disruption recovery model and its hybrid DE algorithm are effective in condition of machine disruptions.
出处 《系统管理学报》 CSSCI 北大核心 2015年第4期485-495,共11页 Journal of Systems & Management
基金 国家自然科学基金重点项目(61034003) 国家科技支撑计划资助项目(2015BAF08B02 2013BAF02B03) 国家863计划资助项目(SS2012AA040909) 教育部人文社会科学研究青年基金资助项目(11YJC630005) 中国博士后科学基金特别资助和面上项目(201104592 20100481222)
关键词 干扰管理 差分进化算法 无等待流水线 作业外包 disruption management differential evolution(DE)algorithm no-wait flow shop production outsourcing
作者简介 作者简介:薄洪光(1975-),男,博士,副教授。研究方向为生产调度与干扰管理。E-mail:hgbo@dlut.edu.cn.
  • 相关文献

参考文献21

  • 1Pinedo M. Scheduling theory, algorithm and systems [M]. Fourth edition, New York: Springer Science-k Business Media, LLC, 2012.
  • 2Garey M R, Johnson D S. Computer and intractability: A guide to the theory of NP-completeness[M]. San Francisco: Freeman, 1979.
  • 3王凌,周刚,许烨,金以慧.混合流水线调度研究进展[J].化工自动化及仪表,2011,38(1):1-8. 被引量:28
  • 4唐国春.2003年到2005年排序(调度)学科在中国的发展(I)[J].上海第二工业大学学报,2006,23(3):167-176. 被引量:3
  • 5Stefan V, Andreas W. Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application [J]. International Journal of Production Economics, 2007, 105(2) : 445-458.
  • 6Santos D L, Hunsucker J L, Deal D E. Global lower bounds for flow shops with multiple processors[J]. European Journal of Operational Research, 1995, 80 (1) : 112-120.
  • 7刘明周,单晖,蒋增强,葛茂根,扈静,张铭鑫.不确定条件下车间动态重调度优化方法[J].机械工程学报,2009,45(10):137-142. 被引量:41
  • 8Yu G, Qi X T. Disruption management : Framework, models and applications[M]. First Eds. Singapore: World Scientific Publishing Co. Pte. Ltd. , 2004.
  • 9Kouvelis P, Daniels R L, Vairaktarakis G. Robust scheduling of a two-machine flow shop with uncertain processing times[J]. IIE Transactions on Scheduling and Logistics, 2000, 32: 421-432.
  • 10Qi X T, Bard J F, Yu G. Disruption management for machine scheduling: The case of SPT schedules[J]. International Journal of Production Economics, 2006, 103(1) : 166-184.

二级参考文献166

共引文献103

同被引文献59

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部