期刊文献+

四老沟矿回采盘区煤柱沿空掘巷支护技术研究

Study on Support Technology of Gob-side Entry in Stoping Panel of Silaogou Mine
在线阅读 下载PDF
导出
摘要 基于大同煤矿集团公司四老沟矿301盘区煤柱面的生产地质条件,综合运用FLAC3D数值计算、现场地质调研和理论分析的方法,从巷道围岩应力分布和表面位移两个方面分析了沿空掘巷围岩变形规律,确定合理的煤柱宽度为5 m。在此基础上对巷道支护参数进行了优化,达到了提高资源回收率的目的。 Based on production geology conditions of the coal pillar of 301 panel in Silaogou Mine of Datong Coal Mine Group, the methods of FLAC3 Dnumerical simulation, field geological investigation and theoretical analysis are integraetly used, surrounding rock deformation law of gob-side entry is analyzed from surrounding rock stress distribution of roadway and surface displacement, the 5 m reasonable coal pillar width is determined, on this basis,the parameters of roadway support are optimized, the purpose of raising resource recovery rate is achieved.
出处 《同煤科技》 2015年第2期6-9,共4页 Datong Coal Science & Technology
关键词 煤矿开采 盘区煤柱 沿空掘巷 coal mining panel pillar gob-side entry
作者简介 李海清,现在大同煤矿集团有限责任公司生产技术部工作。
  • 相关文献

参考文献6

二级参考文献18

  • 1黄润秋,许强.显式拉格朗日差分分析在岩石边坡工程中的应用[J].岩石力学与工程学报,1995,14(4):346-354. 被引量:121
  • 2康红普,鲍海山,张津平,马维绪,武钢,阎润柱.阳泉矿区回采巷道锚杆支护设计[J].煤炭科学技术,1996,24(9):1-5. 被引量:8
  • 3梁海波,李仲奎,谷兆祺.FLAC程序及其在我国水电工程中的应用[J].岩石力学与工程学报,1996,15(3):225-230. 被引量:61
  • 4邢福康.煤矿支护手册[M].北京:煤炭工业出版社,1991..
  • 5谢和平,岩石力学与工程学报,1999年,18卷,4期,371页
  • 6Wilson A N. An hypothesis concerning pillar stability[J]. Mining Engineer, 1972, 6:85-90
  • 7Whittaker B N. Design and stability of pillar in longwall mining[J].Mining Engineer, 1979, 13:68-72
  • 8W.J.Gale. Overview of Strata Control Issues Affecting RoadwayReinforcement and Pillar Design[J]. The Australian Coal Journal,1994(43).
  • 9D.N.Bigby. Developments in British Rockbolting Technology. Coal International. May1997.
  • 10康红普.软岩回采巷道锚杆支护技术的发展,世纪之交软岩工程技术现状与展望[M].北京:煤炭工业出版社,1999.