摘要 在人工湿地污水处理过程中,铝污泥泥饼可作为湿地植物生长的基质以及微生物膜附着生长的多孔载体。经过对铝污泥人工湿地系统的深入研究,旨在阐明此类人工湿地应用的主要关键问题:①铝污泥是否适用于人工湿地?②铝能否从铝污泥中滤出?③铝污泥在湿地中的使用寿命有多久?④磷是否可以从使用过的铝污泥中回收再利用?⑤是否会有堵塞现象的发生,该如何解决?结果表明:从物理、化学测试结果来看,铝污泥是一种适合的人工湿地填料;湿地系统出水中铝确有滤出,但这只发生在试验最初的10—14d之内,且浓度大大低于饮用水准则中规定的限值;铝污泥在人工湿地中的使用寿命为4~17年;从使用过的铝污泥中提取磷是可行的;湿地在运行中会发生堵塞,可考虑采用系统轮空休息及替换为反粒度砾石床延缓堵塞。 Alum sludge cakes can serve er for biofilm development. After the intensive as a substrate for wetland plant growth and a porous carri- studies of the alum sludge-based CW system, the key is- sues in application of this kind of CW system were expounded. These included: ①Is alum sludge suit- able for reuse in CWs? ② Is aluminum released from the sludge? ③What is the lifespan of the alum sludge in CWs? ④ How can phosphorus be recovered from the used alum sludge? and ⑤Does clogging happen in alum sludge-based CW system and what is the solution? The results showed that from the point of physical and chemical test results, alum sludge was a kind of suitable constructed wetland packing. A- luminum was indeed filtered out from wetland system, but this only happened in the first 10 to 14 d of the test, and the concentration was much lower than the limit specified in the drinking water standards. The lifespan of alum sludge in constructed wetlands was 4 to 17 years. It was feasible to extract phosphorus from used alum sludge. Clogging would happen in the operation of the wetland, and it could be consid- ered to use system intermittently and replace with a gravel bed with the particle size from coarse to fine to delay clogging.
出处 《中国给水排水》 CAS CSCD 北大核心 2015年第11期131-136,共6页 China Water & Wastewater
基金 爱尔兰国家环保局项目(2005-ET-MS-38-M3 2005-ET-S-7-M3) 爱尔兰农业部项目(RSF07-528) 爱尔兰企业局项目(PC2007-0308) 长安大学中央高校基本科研业务费专项资金资助项目(2013G1502043 2013G1291073)
关键词 铝污泥 人工湿地 堵塞 再利用 alum sludge constructed wetland phosphorus clogging reuse
作者简介 赵晓红(1976-),女,陕西宝鸡人,博士,硕导,主要研究方向为环境化学、水土污染控制。E—mail:xiaohongzh95@126.com.
  • 相关文献

参考文献27

  • 1Ballantine D J, Tanner C C. Substrate and filter materi- als to enhance phosphorus removal in constructed wet- lands treating diffuse farm runoff: a review [ J ]. New Zealand Journal of Agricultural Research, 2010,53 (1) : 71 -95.
  • 2Zhao Y Q, Babatunde A O, Zhao X H, et al. Develop- ment of alum sludge-based constructed wetland : An inno- vative and cost-effective system for wastewater treatment [J]. J Environ Sci Health A Tox Hazard Subst Environ Eng, 2009,44 ( 8 ) : 827 - 832.
  • 3Babatunde A O,Zhao Y Q. Constructive approaches to- wards water treatment works sludge management:An in- ternational review of beneficial re-uses [ J ]. Critical Re- views in Environmental Science and Technology, 2007, 37(2) :129 - 164.
  • 4Harris W G, Elliott H A, Makris K C, et al. Physico- chemical properties related to long-term phosphorus re- tention by drinking-water treatment residuals [ J ]. Envi- ron Sci Technol,2005,39 ( 11 ) :4280 - 4289.
  • 5Yang Y,Zhao Y Q, Babatunde A O, et al. Characteristics and mechanisms of phosphate adsorption on dewatered alum sludge [ J ]. Sep Purif Technol, 2006,51 (2) : 193 - 200.
  • 6Razali M, Zhao Y Q, Bruen M. Effectiveness of drinking- water treatment sludge in removing different phosphorus species from aqueous solution [ J ]. Sep Purif Technol, 2007,55 ( 3 ) :300 - 306.
  • 7Babatunde A O,Zhao Y Q, Yang Y, et al. Reuse of de- watered aluminium-coagulated water treatment residual to immobilize phosphorus : Batch and column trials using a condensed phosphate [ J ]. Chem Eng J, 2008,136 ( 2/ 3) :108 -115.
  • 8Li Z, Jiang N, Wu F,et al. Experimental investigation of phosphorus adsorption capacity of the waterworks sludges from five cities in China[ J]. Ecol Eng,2013,53 : 165 - 172.
  • 9Zhao Y Q,Wang W K,Zhao X H,et al. Integrated con- structed wetland: A two-tier solution for river water re- source protection and pleasing landscape [ A ]. The Grand Challenges Facing Hydrology in the 21st Centu- ry-Proceedings of Dooge - Nash International Symposi- um [ C ]. Dublin : University College "Dublin, 2014.
  • 10Babatunde A O,Zhao Y Q, Burke A M,et al. Character- ization of aluminium-based water treatment residual for potential phosphorus removal in engineered wetlands [J]. Environ Pollut,2009,157(10): 2830-2836.

同被引文献224

引证文献19

二级引证文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部