大型施工现场综合布置施工策划与管理 被引量:21

CONSTRUCTION SITE LAYOUT OF LARGE COMPREHENSIVE CONSTRUCTION PLANNING AND MANAGEMENT
在线阅读 下载PDF
导出
摘要 北京绿地中心工程总建筑面积351 524 m2。其中,4号商务办公楼为超高层建筑,建筑高度260m。由于施工场地狭小、工期紧张,特别是4号商务办公楼,建筑高度高、体量大,各专业交叉作业多。因此,项目部提前策划,进行了大型施工现场总平面布置与管理,创新使用了绿色路面、提升电梯门、电锅炉供暖等措施,社会效益和经济效益显著,实现了绿色施工目标。 The total construction area of 351524 square meters of Beijing Green Center project. Among them, 4 office building is a super high-rise building, building height 260m. Narrow construction site, the tight work schedule, especially 4 commercial office buildings, building height, body mass, the professional cross much homework. Therefore, the project Department of advance planning, scientific, reasonable of general layout and management of large construction site, careful organization and management, innovative use of the green road, elevator door, electric boiler heating and other measures, social benefits and economic benefits significantly, realize the goal of green construction.
出处 《建筑技术》 北大核心 2015年第4期313-316,共4页 Architecture Technology
关键词 超高层 大型现场布置 绿色路面 绿色施工 super-high building large site layout green road green construction
作者简介 吴华(1976-),男,四川达州人,项目副总工,e—mail:593371829@qq.com
  • 相关文献

参考文献1

二级参考文献3

共引文献13

同被引文献69

引证文献21

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部