期刊文献+

旋挖钻孔桩沉渣产生原因及清孔工艺优化选择 被引量:31

Causes of Sediment at the Bottom of Rotating Drilling Pile and Optimal Selection of Hole Cleaning Method
在线阅读 下载PDF
导出
摘要 随着旋挖钻孔灌注桩的广泛应用,桩底沉渣过厚成为突出的质量通病。结合旋挖钻孔灌注桩的施工实践,分析了桩底沉渣过厚产生的原因,介绍了6种泥浆正循环、反循环、无循环清孔工艺和方法,并对比分析了各种清孔工艺的特点,提出了旋挖桩清孔工艺的优化选择方法。 With the widely application of the rotating drilling pile, the overweighting sediment at the hole bottom is becoming one of the most prominent quality problems. This paper has analyzed the causes of the overweighting sediment at the hole bottom, which is based on the author ’ s construction practice experience of working on rotating excavation drilling cast-in-place pile. In addition, it also introduces six holes cleaning methods including the slurry direct circulation, slurry reverse circulation, non-cycle, and so on. And by the comparison analysis of all the hole cleaning methods, the authors give an optimal selection method of cleaning process in the rotating excavation drilling pile.
出处 《施工技术》 CAS 北大核心 2014年第19期48-53,共6页 Construction Technology
关键词 旋挖钻孔桩 沉渣 清孔 施工工艺 优化 piles rotating drilling pile sediments hole cleaning construction optimization
作者简介 雷斌,高级工程师,E-mail:leibin479@gmail.com
  • 相关文献

参考文献2

二级参考文献4

  • 1中围建筑科学研究院.JGJ94-2008建筑桩基技术规范[s].北京:中困建筑工业出版社,2008.
  • 2雷斌."潜水电泵+泥浆净化器"系统在大直径、超深冲孔灌注桩施工中二次清孔施工技术研究[M].深圳:2012.
  • 3中国建筑科学研究院.GB50202-2002建筑地基基础工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.
  • 4中国建筑科学研究院.JGJl06-2003建筑桩基检测技术规范[S].北京:中国建筑工业出版社,2003.

共引文献177

同被引文献140

引证文献31

二级引证文献91

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部