综采大断面切眼一次成巷技术研究 被引量:4

Study on Once-tunneling Construction Technology with Large Cross-section Open-off Cut in Fully-mechanized Face
在线阅读 下载PDF
导出
摘要 为了解决潘三矿1642(1)大断面切眼的支护及施工技术难题,实现工作面的快速接替,分析了大断面切眼的支护原理,提出了锚网索、T3钢带和单体液压支柱配合工字钢挑梁的联合支护方式。同时根据一次成巷与二次成巷的优缺点对比,最终确定采用分次交替掘进、一次成巷的施工方案并取得了良好的社会经济效益,为类似条件下大断面切眼巷道的施工提供了很好的借鉴和参考。 In order to solve the support and construction technical problems occurred in 1642 (1) large-sectioned open-off cut of Pansan Mine, and realize the prompt succeed among working faces, the support mechanism of large-sectioned open-off cut was analyzed, and furthermore, the collaborative support program consist of anchor-cable, 'IB steel strip and joist cantilever beam suited with single hydranhc bracket was put forward. Besides, according to the comparison of advantages and disadvantages of disposable and secondary roadway formation, the final construction program, including graded alternately tunneling and disposable roadway formation, were adopted and achieved good social and economic benefits, which further provided reference for roadway construction in large-section open-off cut under similar conditions.
作者 尚刚
出处 《煤炭与化工》 CAS 2014年第8期94-97,共4页 Coal and Chemical Industry
关键词 综采工作面 大断面 开切眼 支护技术 一次成巷 fully-mechanized face large cross-section open-off cut supportng technology once-tunneling
作者简介 尚刚(1982-),男,安徽淮南人,助理工程师。E-mail470783905@qq.com
  • 相关文献

参考文献10

二级参考文献65

共引文献676

同被引文献29

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部