A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile 被引量:5

A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile
在线阅读 下载PDF
导出
摘要 The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target production. A mixed integer linear programming algorithm is formulated to find the min- ing sequence of blocks from a predefined pit shell and their respective destinations, with two objectives: to maximize the net present value of the operation and to minimize the cost of uncertainty. An efficient clustering technique reduces the number of var/ables to make the problem tractable. Also, the parameters that control the importance of uncertainty in the optimization problem are studied. The minimum annual mining capacity in presence of grade uncertainty is assessed. The method is illustrated with an oil sand deposit in northern Alberta. The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target production. A mixed integer linear programming algorithm is formulated to find the mining sequence of blocks from a predefined pit shell and their respective destinations, with two objectives:to maximize the net present value of the operation and to minimize the cost of uncertainty. An efficient clustering technique reduces the number of variables to make the problem tractable. Also, the parameters that control the importance of uncertainty in the optimization problem are studied. The minimum annual mining capacity in presence of grade uncertainty is assessed. The method is illustrated with an oil sand deposit in northern Alberta.
出处 《International Journal of Mining Science and Technology》 SCIE EI 2014年第4期451-459,共9页 矿业科学技术学报(英文版)
关键词 Production scheduling Ceostatistics Conditional simulation Kriging Cost of uncertainty 不确定性 线性规划模型 矿区规划 生产调度问题 储备 线性规划算法 生产计划 混合整数
作者简介 Tel.: +1 587 4369685. E-mail address: Behrang.Koushavand@ualberta.ca .
  • 相关文献

参考文献22

  • 1Whittle J. The Facts and fallacies of open pit optimization. Whittle Programming Pty Ltd 1989.
  • 2Osanloo M. Gholamnejad J. Karimi B. Long-term open pit mine production planning: a review of models and algorithms. Int J Min Reclam Environ 2008;22:3-35.
  • 3Vallee M. Mineral resource+engineering, economic and legal feasibility=ore reserve. CIM Bull 2000;90:53-61.
  • 4Koushavand B. Askari-Nasab H. Transfer geological uncertainty through mine planning. MPES. MPES-International Symposium of Mine Planning/Equipment Selection 2009.
  • 5Dowd PA. Risk assessment in reserve estimation and open-pit planning. Trans Inst Min MetaIl1994;103:A148-54.
  • 6Ravenscroft PJ. Risk analysis for mine scheduling by conditional simulation. Can Min Metall Bull 1992;101:82-8.
  • 7Ramazan S. Dimitrakopoulos R. Traditional and New MIP Models for Production Scheduling With In-Situ Grade Variability. 2004;18:85-98.
  • 8Godoy M. Dimitrakopoulos R. Managing risk and waste mining in long-term production scheduling of open pit mine. SME Ann Meet Exhib 2003;316:43-50.
  • 9Leite A. Dimitrakopoulos R. Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit. Trans Inst Min Metall 2007;116:109-18.
  • 10Dimitrakopoulos R, Ramazan S. Stochastic integer programming for optimising long term production schedules of open pit mines: methods, application and value of stochastic solutions. Min Technol 2008;117: 155-60.