期刊文献+

装备系统可修部件闭环保障系统绩效研究 被引量:1

Performances of repairable parts closed-loop support system for equipment systems
在线阅读 下载PDF
导出
摘要 基于绩效的后勤保障(PBL)正成为军事装备系统一种主导型保障战略。构建一个由备件仓库和部件修理车间组成的装备系统可修部件闭环保障系统。推导出备件库存水平状态稳态概率分布,获得如可用度等几个重要的保障绩效度量指标。采用数值仿真技术考察系统参数在平时与战时环境下对保障绩效的影响。结果表明,初始备件库存水平对系统可用度影响较小且随着故障强度的增加影响程度减弱,而修复能力对系统可用度影响显著。 Performance-Based Logistics(PBL)is becoming a dominant support strategy for military equipment systems. This paper sets up a closed-loop support system which consists of a spare parts warehouse and a repair workshop. The steady-state probability distribution of spare part inventory level is derived and furthermore several important perfor-mance measures such as availability are obtained. The effects of system parameters on support performances under peace or war environments are considered by numerical analysis. The results show that the base spare parts inventory level has little effect on the system availability and the degree of effect is decreasing as the failure intensity increases. But, the repair intensity has obvious effect on the system availability.
出处 《计算机工程与应用》 CSCD 2014年第18期54-58,共5页 Computer Engineering and Applications
基金 中央专项资金青年教师基金项目(No.13NZYQN28) 中国博士后科学基金(No.2013M542269)
关键词 可修部件 绩效 备件库存 修复强度 稳态概率分布 repairable parts performance spare inventory repair intensity steady-state probability distribution
作者简介 赵丹(1982-),女,博士生,讲师,主要研究领域为信息管理与技术经济; 刘名武(1979-),通讯作者,男,博士,博士后,副教授,主要研究领域为随机服务系统建模; 彭冠军(1980-),男,研究生,少校,主要研究领域为军事后勤学。E-mail:liumingwu2007@aliyun.com
  • 相关文献

参考文献15

  • 1谢力,魏汝祥,于伟宗.舰船装备维修费预测方法评价准则体系研究[J].中国舰船研究,2011,6(2):98-102. 被引量:8
  • 2SherBrookeCC.装备备件最优库存建模-多级技术[M].北京:电子工业出版社,2008.
  • 3Berkowitz D, Gupta J N, Simpson J T, et al.Defining and implementing performance based logistics in government[J]. Defense Acquisition Review Journal, 2005,37( 2 ) : 255-267.
  • 4Kim S H, Cohen M A, Netessine S.Performance contracting in after-sales service supply chains[J].Management Science, 2007,53 ( 12 ) : 1843-1859.
  • 5Devries H J.Performance-based logistics-barriers and enablers to effective implementation[J].Defense Acquisition Review Journal, 2004, 11 (2) : 243-254.
  • 6Nowicki D,Kumar U D,Steudel H J,et al.Spares provi- sioning under performance-based logistics contract:profit- centric approach[J].Journal of the Operational Research Society, 2008,59(3) : 342-352.
  • 7Ng Irence C L, Roger M,Nick Y.Outcome-based con- tracts as a driver for systems thinking and service-domi- nant logic in service science: evidence from the defense industry[J].European Management Journal, 2009, 27 (6) : 377-387.
  • 8Sleptchenko A, Heijden van der M C, Harten A.Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems[J].International Journal of Pro- duction Economics, 2002,79 (3) : 209-230.
  • 9Sleptchenko A, Heijden van der M C, Harten A.Trade-off between inventory and repair capacity in spare part net- works[J].The Journal of the Operational Research Society, 2003,54(3) : 263-272.
  • 10Sleptchenko A, van der H M C.Using repair priorities to reduce stock investment in spare part networks[J]. EUropean Journal of Operational Research, 2005, 163 (3) :733-750.

二级参考文献55

共引文献26

同被引文献15

  • 1杨俊安,庄镇泉.量子遗传算法研究现状[J].计算机科学,2003,30(11):13-15. 被引量:54
  • 2Kim S H,Cohen M A,Netessine S.Performance contract- ing in after-sales service supply chains[J].Management Science,2007,53 (12) - 1843-1858.
  • 3Ng Irence C L, Maull R, Yip N.Outcome-based contracts as a driver for systems thinking and service-dominant logic in service science: evidence from the defense indus- try[J].European Management Journal, 2009,27 (6) : 377-387.
  • 4Nowicki D R,Randall W S ,Ramirez-Marquez J E.lmprov- ing the computational efficiency of metric-based spares algorithms[J].European Journal of Operational Research, 2012,219(2) :324-334.
  • 5Devries H J.Performance-based logistics-barriers and enablers to effective implementation[J].Defense Acquisition Review Journal, 2004,11 (2) : 243-254.
  • 6Phillips E H.Performance approach[J].Aviation Week 163(17):52-55.
  • 7based logistics: a whole new and Space Technology, 2005, Guajardo J A, Cohen M A, Kim S H, et al.Impact of performance-based contracting on product reliability: an empirical analysis[J].Management Science, 2012, 58 (5) : 961-979.
  • 8Jin T,Wang P.Planning performance based contracts con- sidering reliability and uncertain system usage[J].Joumal of the Operational Research Society,2012,63 (10) : 1467-1478.
  • 9Mirzahosseinian H, Piplani R.A study of repairable parts inventory system operating under performance-based contract[J].European Journal of Operational Research, 2011,214(2) :256-261.
  • 10陆传赉.排队论[M].北京:北京邮电大学出版社,2010.

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部