近水平煤层大采高综放开采冒落带高度研究 被引量:11

Study on Caving Zone Height of Large Mining Height Fully Mechanized Caving Mining in Horizontal Seam
原文传递
导出
摘要 根据同忻煤矿的开采技术条件及围岩力学参数,应用离散元数值模拟软件UDEC分析了综放采场上覆岩层的运动特征,根据覆岩位移变化规律,确定了覆岩的冒落带高度,并将模拟结果与分层综采理论计算、综放开采理论计算结果以及实测资料对比,结果表明模拟结果与综放开采理论计算结果以及实测结果相互印证,分层综采理论计算结果则偏差较大,说明原有分层综采理论计算公式已经不再适用于综放开采,而利用数值模拟的方法确定综放面覆岩冒落带高度是一种可行的方法。 According to Tongxin Coal Mine mining technological conditions and surrounding rock mechanics parameters, the motion characteristics of the overburden at fully mechanized caving face were analyzed by discrete element numerical simulation software UDEC. The height of caving zone was determined based on the overburden's displacement change law. Comparing the simulation results with the theoretical calculation of fully mechanized slicing method and fully mechanized caving mining and measured data, the results indicates that the simulation results match with fully mechanized caving mining theoretical calculation and measured data. While the deviation compared with fully mechanized slicing method is fairly large, which explains that the original theoretical calculation formula is no longer applicable to fully mechanized caving mining, and using numerical simulation method to determine the height of caving zone is one of feasible methods.
出处 《煤矿安全》 CAS 北大核心 2014年第7期23-25,共3页 Safety in Coal Mines
关键词 近水平煤层 综放开采 冒落带 UDEC 大采高 horizontal seam fully mechanized caving mining caving zone UDEC large mining height
作者简介 刘金凯(1989-),男,河北唐山人,中国矿业大学(北京)在读硕士研究生,主要从事矿压及放顶煤方面的研究。
  • 相关文献

参考文献9

二级参考文献45

共引文献251

同被引文献74

引证文献11

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部