期刊文献+

一种改进的工程结构全寿命设计理论指标体系 被引量:10

Modified life-cycle design index system of engineering structures
原文传递
导出
摘要 以结构耐久性为主线,对现有工程结构全寿命设计理论框架进行重组,将结构的全寿命设计目标总结为可靠性目标和可持续性目标两方面,建立了包含安全性、适用性、耐久性、经济影响、环境影响和社会影响等设计目标的全寿命设计体系,并确定了基于结构动态性能的全寿命设计思路。通过建立结构可持续发展指标,解决了现有全寿命设计理论中概念模糊和指标重复的问题,并完善了全寿命成本的内涵。改进后的全寿命设计理论指标体系具有更为完善合理的构架,能够广泛适应各种结构类型和使用情况。 Following the mainline of structural durability,this paper restructured the theoretical framework of life-cycle design (LCD)method,and set up the reliability and sustainability LCD objectives,including safety,serviceability, durability,economic impacts,environmental impacts and social impacts.The modified LCD method was carried out through the dynamic performance-based design concept.It solved the problems of vague concepts and repeated indicators in current LCD methods by setting up the sustainability indicator,and also replenished the contents of lifecycle cost (LCC)at the same time.The modified LCD index system possesses a more complete and reasonable framework,and can be applicable to a wide variety of structural types and service conditions.
作者 王竹君 夏晋 金伟良 WANG Zhujun;XIA Jin;JIN Weiliang(Institute of Structural Engineering,Zhejiang University,Hangzhou 310058,China)
出处 《建筑结构学报》 EI CAS CSCD 北大核心 2019年第1期40-48,共9页 Journal of Building Structures
基金 国家重点研发计划专项(2016YFC0701406) 国家自然科学基金项目(51278459 51578490)
关键词 全寿命设计 结构耐久性 动态性能 可持续性 全寿命成本 life-cycle design structural durability dynamic performance sustainability life-cycle cost
作者简介 王竹君,出生于1991年,女,博士研究生,主要从事结构全寿命设计研究。E-mail:zj_wang@zju.edu.cn;通信作者:金伟良,出生于1961年,男,工学博士,教授,主要从事结构耐久性和全寿命设计研究。E-mail:jinwl@zju.edu.cn.
  • 相关文献

参考文献5

二级参考文献48

  • 1陈光,成虎.建设项目全寿命期目标体系研究[J].土木工程学报,2004,37(10):87-91. 被引量:70
  • 2邵旭东,彭建新,晏班夫.桥梁全寿命设计方法框架性研究[J].公路,2006,51(1):44-49. 被引量:38
  • 3金伟良,宋志刚,赵羽习.工程结构全寿命可靠性与灾害作用下的安全性[J].浙江大学学报(工学版),2006,40(11):1862-1868. 被引量:20
  • 4周立,葛耀君.全寿命经济分析中折现率的确定[J].上海公路,2007(2):51-54. 被引量:11
  • 5Officer Asset Management, Department of Transportation, FHWA. Life-Cycle Cost Analysis Primer[R].2002.
  • 6Kong J S, Frangopol D M. Prediction of reliability and cost of deteriorating bridges under time-and performance-controlled maintenance [J]. J. of Str.Eng., ASCE, 2004,130(12).
  • 7Hassanain M A, Loov R E. Cost optimization of concrete bridge infrastructure[J]. Canadian Journal of Civil Engineering, 2003,30.
  • 8Liu C, Hammad A, Itoh Y. Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm [J]. Computer-aided Civil and infrastructure Engineering, 1997,12.
  • 9Miyamoto A, Kawamura K, Nakamura H. Bridge management system and maintenance optimization for existing bridge [J]. Computer-aided Civil and Infrastructure Engineering, 2000,15.
  • 10Lee Y J, Chang L M. Rehabilitation decision analysis and life-cycle costing of the infrastructure system[J].Construction Research, 2003.

共引文献89

同被引文献73

引证文献10

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部