摘要
论述了国家电力公司超高压电缆实验室的主要高电压设备的参数及确定方法 ,电缆导体感应加热测量控制系统的研制 ,电缆屏蔽大厅结构、尺寸确定和屏蔽技术 。
This paper presents the construction of the extra high voltage cable laboratory of state power corporation of China, including the choice of technical parameter for the main high voltage equipment, development of the heating system of the cables conductor by induced current and the temperature measurement, research and determination on the construction, dimensions and screen technique of the cable test screen hall and arrangement of the prequalification test yard.
出处
《高电压技术》
EI
CAS
CSCD
北大核心
2001年第1期62-63,66,共3页
High Voltage Engineering