海口世纪大桥主塔沉井,下沉深度达 36m,施工处于台风频发区。介绍沉井钢壳整体制作吊装、滑模接高钢筋混凝土井体、钻吸法破土吸泥、泥浆套助沉、信息监控等施工技术。
With a sunk depth of 36m, the sunk well for the main tower of Haikou Century Bridge is constructed at the area where typhoon occurs frequently. The construction technology of integral manufacture and erection of steel casing, heightening by sliding formwork, sucking soil by drilling& sucking method, assisting sinking by slurry, as well as information monitoring, etc. are introduced.