超高烟囱电动升模平台安装技术

Installation Technology for Electric Lifting Formwork Platform in Ultra High Chimney Construction
在线阅读 下载PDF
导出
摘要 超高烟囱采用电动升模的工艺施工,即以筒壁为承力主体,通过附着于已具有较高强度的钢筋混凝土筒壁上的支模操作架和提升架,以及联结操作架和提升架的电动提升设备,一架固定,一架相对运动,交替爬升,从而带动模板及整个施工平台的提升。该工法可大幅提高施工效率,从而达到缩短工期的目的。满足了工程进度、质量及安全文明施工的要求,取得了良好的社会效益和经济效益。 The electric lifting formwork process is used for the ultra high chimney construction. In this process, the formwork operation frame and the lifting frame are attached to a high-strength reinforced concrete cylinder wall, together with the electric lifting equipment which connects these two frames. Two frames then move up alternatively to lift the formwork and the entire construction platform. This method can significantly improve the efficiency of construction, so as to achieve the purpose of shortening the construction duration. It also meets the requirements of construction progress, quality, safety and civilized construction, and achieves good social and economic benefits.
出处 《建筑施工》 2014年第5期575-578,共4页 Building Construction
关键词 烟囱 升模平台 安装 荷载试验 chimney lifting-formwork platform installation load testt
作者简介 彭晓月(1972-),男,大专,工程师.通讯地址:武汉市洪山区鲁磨路306号(430074).
  • 相关文献

参考文献7

二级参考文献6

  • 1陈兆家,潘连军.DZMS-Ⅲ型电动升模工艺在火电厂烟囱施工中的应用.2005年10月1日-第二届江苏省电机工程青年科技论坛.
  • 2陈基发,胡德炘,金新阳,等.GB50009-2001建筑结构荷载规范[S].北京:中国建筑工业出版社,2002.
  • 3王健,张良杰,赵玉章,等.JGJ195-2010液压爬升模板工程技术规程[S].北京:中国建筑工业出版社,2010.
  • 4范培痒,曹淑琴,孙森,等.JGJ]4-1986建筑机械技术试验规程[s].北京:中国建筑工业出版社,1986.
  • 5袁海军,尹容,冷小克,等.GBT50621--2010钢结构现场检测技术标准[s].北京:中国建筑工业出版社,2010.
  • 6耿沽明,张宝利,郭道盛,等.JGJ59-2011建筑施工安全检查标准[s].北京:中国建筑工业出版社,2011.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部