期刊文献+

带副拱中承式菱形变截面钢管混凝土系杆拱桥主拱肋安装技术 被引量:3

Installation Technology for Main Arch Rib of a Concrete-filled Steel Tubular Half-through Tied-arch Bridge with Vice Arch and Rhombic Variable Cross-section
在线阅读 下载PDF
导出
摘要 结合芜湖袁泽桥主桥施工,介绍国内首座带副拱中承式菱形变截面钢管混凝土系杆拱桥主拱肋安装技术,主要包括主拱肋的安装工艺、缆索吊机及扣挂系统的设计、拱肋A段支撑架的设计及作业平台搭设、测量控制、焊接标准的采用及安装尺寸标准等内容,为类似工程施工提供参考。 This paper was based on the construction of main bridge of the Wuhu Yuanze Bridge, the first one in China in the form of concrete-filled steel tubular half-through tied-arch bridge with vice arch and rhombic variable cross-section. This paper expounded the installation technology of the main arch rib of this bridge, mainly including how to install the main arch rib, how to design the cable crane and buckling-anchoring system, how to design the support frame used in section A of the arch rib, how to erect the work platforms, how to achieve measurement and controlling, how to adopt welding standard and mounting dimension standard, etc. , so as to provide reference for similar projects.
作者 潘寿东
出处 《铁道标准设计》 北大核心 2014年第6期76-83,共8页 Railway Standard Design
基金 中国铁道建筑总公司科技研究开发计划项目(09-26C)
关键词 钢管混凝土系杆拱桥 带副拱 中承式 菱形变截面 主拱肋 安装 tied-arch bridge consisting of concrete-filled steel tubes being accompanied with vice arch half-through bridge rhombic variable cross-section main arch rib installation
作者简介 潘寿东(1964-),男,教授级高级工程师,1988年毕业于西南交通大学铁道工程专业,工学学士;2006年毕业于上海交通大学建筑与土木工程专业,工程硕士;E-mail:931246628@qq.com。
  • 相关文献

参考文献7

二级参考文献13

共引文献205

同被引文献33

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部