期刊文献+

成组加工单元零件排序的研究 被引量:1

Study on Scheduling of Parts in Group Technology Machining Unit
在线阅读 下载PDF
导出
摘要 基于成组加工中作业计划的要求,采用组间排序和组内排序两次排序优化,构造了成组加工单元待加工零件的排序优化模型根据组内与组间排序的不同特点,采用了不同的方法,组内排序是在约翰逊-贝尔曼规则的基础上应用了新启发式算法;组间排序是先将待加工零件组的排序问题转换为平衡指派问题。 Based on the demands of manufacture plan of GT machining unit,an optimum scheduling model is built up by means of two kinds of scheduling.Different methods are applied to the different scheduling according to their particular characteristics: a new inspiring method is applied to the scheduling of parts in a group based on R.Bellman rule,while for the scheduling of parts groups the scheduling problem is converted into the assignment problem before Hungary algorithm is adopted. This model proves to be an ideal solution to the scheduling of parts in GT machining unit.
出处 《江苏理工大学学报(自然科学版)》 2000年第1期57-60,共4页 Journal of Jiangsu University of Science and Technology(Natural Science)
关键词 排序 组成技术 加工 零件 工业企业 生产管理 sequencing group technology manufacture
  • 相关文献

参考文献3

二级参考文献10

  • 1黄德才,博士学位论文,1994年
  • 2常庆龙,数学的实践与认识,1987年,3期,28页
  • 3刘泉,运筹学的理论与实践(译),1987年
  • 4常庆龙,数学的实践与认识,1979年,3期,22页
  • 5Campbell H G, Dudek R A, Smith M L. A Heuristic Algorithm for the (n)Job, (m) Machine Sequencing Problem. Management Science, 1970, 16(10) :630-637.
  • 6Graves S D. A Review of Production Scheduling. Operations Research, 1981,29(4).
  • 7何桢,崔克讷,李崇斌.流水车间作业计划排序问题的模型分析及启发式算法.中国机械工程学会第二次工业工程学术会议论文集,1991,10.
  • 8Palmer D S. Sequencing Jobs Through A Multistage Process in the Minimum Total Time -A Quick Method of Obtaining a Near Optimum. Operational Society (Quarterly), 1965.
  • 9刘润三.系统安全性的模糊综合评估法[J].工业安全与防尘,1991(2):17-18. 被引量:11
  • 10赵家振.灰色关联度的安全综合评价法[J].工业安全与防尘,1991(3):26-28. 被引量:16

共引文献15

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部