期刊文献+

高速铁路简支箱梁的温差控制 被引量:5

Temperature difference control for simply supported box girder of high-speed railway
在线阅读 下载PDF
导出
摘要 针对高速铁路简支箱梁施工过程因混凝土内外温差过大出现温度裂缝的问题,提出了箱梁预应力孔道通水和内腔通风的温差控制措施.确定了混凝土温度应力场仿真参数的取值,并通过温度场仿真结果与试验结果的对比,验证了参数取值的准确性.对自然养护状态下和温度控制措施下简支箱梁温度应力场进行仿真分析的结果表明:通过温差控制措施,简支箱梁混凝土的最大压应力由支点截面段的2.77 MPa降至跨中截面段的2.21 MPa,最大拉应力由支点截面段的1.255 MPa降至跨中截面段的1.00 MPa,从而有效控制温度裂缝的产生.我国规范规定的15℃的温差限值显得过于严格,可放宽至20℃. The temperature difference control measures of circulating water through prestressed ducts and ventilating through the box girder cavity are put forward in the paper due to the temperature cracks resulted from excessive temperature difference between inside and outside the concrete.The parameters of the thermal stress field simulation are determined.Parameter values are verified accurately according to the comparison between simulation results and the test results.Thermal stress fields of simply supported box girder are simulated respectively in the state of nature curing and temperature control measures.The results show that the maximum compressive stress reduces from 2.77 MPa of fulcrum section to 2.21 MPa of mid-span section,and the maximum tensile stress reduces from 1.255 MPa of fulcrum section to 1.O0 MPa of mid-span section,which makes the temperature crack effectively controlled.In addition,the limited value of 15 ℃ of temperature difference of the specification appears to be too rigorous,and can be relaxed to 20 ℃.
出处 《北京交通大学学报》 CAS CSCD 北大核心 2014年第1期88-93,共6页 JOURNAL OF BEIJING JIAOTONG UNIVERSITY
基金 国家自然科学基金资助项目(51078025) 中央高校基本科研业务费专项资金资助(2011YJS250) 高等学校博士学科点专项科研基金资助(20110009110016)
关键词 桥梁工程 高速铁路 简支箱梁 温度应力场 裂缝 bridge engineering high-speed railway simply supported box girder thermal stress field crack
作者简介 周勇政(1985-),男,河南平顶山人,博士生.研究方向为桥梁设计理论与应用.email:10115279@bjtu.edu.cn. 通讯作者:朱尔玉(1963-),男,山东莱芜人,教授,博士,博士生导师.email:eyzhu@bjtu.edu.cn.
  • 相关文献

参考文献9

二级参考文献20

共引文献311

同被引文献46

引证文献5

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部