摘要 解决现场调试问题,首先要找到问题根源,理清设计、系统运行、试验方法等的上下游之间的关联,结合现场情况制定最佳解决方案。更好、更高效地解决现场出现的问题,来自于对现场情况的充分了解与调试各方的充分沟通,本文列举了一些系统调试出现的问题并详细论述了问题的解决过程。 To solve the plant field problems during the test and start-up, the key is to fred the problem source. To achieve the optimized method, the field environment, the relation of design, operation and test must be clarified. To solve the plant field problems efficiently, the field environment shall be understood deeply and the engineers shall have a perfect communication during plant test and start-up period. Some problems for plant test and start-up are illustrated and the solutions are also addressed in detail.
出处 《自动化博览》 2014年第2期76-78,80-82,共6页 Automation Panorama1
关键词 消防水生产系统(JPP) 系统调试 化学和容积控制系统 (RCV) Firefighting watering production system (JPP) System commissioning Chemical and volume control system
作者简介 王兰兰(1985-),女,江苏人,本科,现就职于中国核电工程有限公司,主要研究方向为核电站核辅助系统的仪控设计和科研工作, 章振宇(1981-),男,江苏常州人,高级工程师,本科,现就职于中核核电运行管理有限公司,主要从事仪控方面的研究. 廖胜勇(1981-),男,湖北人,工程师,研究生,现就职于中国核电工程有限公司,主要从事核电厂仪控设计方面的工作 王占元(1985-),男,吉林人,工程师,研究生,现就职于中国核电工程有限公司,主要从事核电厂仪控设计方面的工作 李珊珊(1982-),女,安徽人,工程师、本科,现就职于中国核电工程有限公司,主要从事核电厂仪控设计方面的工作
  • 相关文献

参考文献3

二级参考文献18

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部