期刊文献+

影响盾构隧道衬砌接头刚度的因素 被引量:14

Factors affecting joint stiffness of shield tunnel lining
在线阅读 下载PDF
导出
摘要 通过南水北调穿黄盾构隧道仿真模型试验 ,对影响接头刚度的主要因素即连接螺栓的布置、螺栓垫圈的厚度、管片与管片之间垫层材料的性能和厚度、连接螺栓的预紧力的大小及管片接头不同的受力状态进行了系统的分析 。 Through simulating model tests of shield tunnel passing through the Yellew River in the diversion project from south to north China,a systematic analysis on the primary factors affecting joint stiffness,including arrangement of joint bolt,thickness of annular packing of bolt,behavior and thickness of cushion material between two tube plates,magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc.,are performed.The study results may provide reference for tube plate design of shield tunnel.
作者 何英杰 袁江
出处 《长江科学院院报》 CSCD 北大核心 2001年第1期20-22,26,共4页 Journal of Changjiang River Scientific Research Institute
关键词 接头刚度 盾构隧道 仿真模型试验 衬砌 南水北调 joint stiffness shield tunnel simulating model test similarity condition
  • 相关文献

参考文献2

  • 1马迁,南水北调穿黄工程隧洞衬砌接头刚度试验研究,1996年
  • 2程骁,盾构施工技术,1990年

同被引文献139

引证文献14

二级引证文献116

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部