煤矿斜井双模式TBM掘进时围岩坍塌原因分析及防治措施 被引量:6

An Analysis of the Causes for and Preventive Measures Against the Collapse of the Surrounding Rock During the Excavation with the Dual-Mode TBM for Coal Mine Inclined Shafts
在线阅读 下载PDF
导出
摘要 双模式TBM是单护盾TBM与土压平衡EPB盾构机的优化组合,拥有针对不同围岩状态的两种掘进模式,对地质范围的适应性更大。在煤矿斜井深埋复杂地层条件下,由于地质因素、TBM掘进参数控制不当等原因,易导致围岩坍塌。对此提出在TBM掘进前、掘进过程中不同阶段防治坍塌控制方法,即采用超前地质预报、超前加固预处理和掘进参数监测与控制措施,有效防止了TBM围岩坍塌现象。 Having two driving modes for different types of surrounding rock,the dual-mode TBM is the optimized combination of the single-shield TBM and the soil-pressure-balanced EPB shields, which is more widely appliable to various geological condi- tions of surrounding rock. As far as coal mine inclined shafts are concerned, which are located in deep-buried strata and geologi- cally complex, the collapse of the surrounding rock is often liable to happen due to the complex geological conditions and the im- proper control of the excavation parameters of the TBM,in which case some collapse-preventing measures before and during the different stages of the excavation of the TBM are presented in the paper, such as the adoption of the advanced geological fore- cast, the strengthening pre-treatment, the monitoring of the excavation parameters and other control measures, all of which help prevent the collapse of the surrounding rock during the excavation of the dual-mode TBM.
出处 《国防交通工程与技术》 2014年第1期74-77,共4页 Traffic Engineering and Technology for National Defence
关键词 煤矿斜井 双模式TBM 围岩坍塌 软岩 掘进参数 超前地质预报 加固预处理 coal mine dual-mode TBM collapse of the surrounding rock soft rock excavation parameters advanced geological forecast strengthening pre-treatment
作者简介 邹春华(1983-),男,博士,高级工程师,主要从事城市地铁盾构施工及斜井TBM(盾构)施工技术研究与管理工作chun-huazou@163.com
  • 相关文献

参考文献3

二级参考文献28

共引文献73

同被引文献87

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部