摘要
梨园水电站是金沙江中游河段一库八级中的第2个大型梯级电站,装设4台600MW水轮发电机组,最大水头118m,额定水头106m。结合该电站特大型机组及地面厂房的特点开展水力机械设计工作,对水力机械设计的主要特点进行了总结,以保证技术先进、可靠,满足电站长期安全稳定运行要求。
Being the second largest cascade hydropower plant in the middle reaches of the Jinsha River where one reservoir and eight cascade hydropower plants are located to build as planned, equipped with 4 sets of 600 MW water turbine--generators each, the Liyuan Hydropower Plant enjoys the maximum water head of 118m and the rated water head of 106m. The design of the hydraulic machinery was made according to the characteristics of the extra large generating units and the surface powerhouse, and its major features have been summed up to ensure being advanced and reliable of the technology and to satisfy the requirement of long--term safe and stable operation of the hydropower plant.
出处
《云南水力发电》
2013年第6期121-124,共4页
Yunnan Water Power
关键词
水力机械
设计特点
总结
梨园水电站
hydraulic machinery
design features
sum up
Liyuan Hydropower plant
作者简介
杨加明(1974-),男,山东郯城人,高级工程师,主要从事水电站机电设计研究工作。