介绍了在净水厂常规处理和深度处理之间不设置中间提升泵房的水力高程布置形式,分析了其在新建水厂工程中的适用性。结果表明在一定条件下,该种布置形式具有节能、节地、便于管理的优势,适于建设用地紧张、自然地形有一定坡度的新建水厂。
The hydraulic elevation layout without intermediate boosting pumping station between the conventional treatment processes and the advanced treatment processes was introduced.The feasibility of the layout in new water treatment plant was analyzed.The results indicated that this layout had the advantages of energy saving,land saving and easy management.It is suitable for construction of new water treatment plants with land shortage and natural terrain with a slope.