钻爆法与全断面掘进机修建地下隧洞的比较 被引量:3

Comparison on the “Drill Blast” Method and the TBM Method
在线阅读 下载PDF
导出
摘要 本文以引黄工程为例 ,对两种施工方法 ,从破岩理论、进度、质量安全、经济等有关方面进行了比较 ,针对不同工程 ,如何正确选用施工方法 ,作者提出了自己的看法。 In this paper,the YRDP is takes as an example,two construction methods,namely the “drill-blast” method amd the TBM method,are compared each other in many fields such as the theory of crushing rock,the construction progress,the quality and the safety in construction and the economy.The conclusion is that the TBM method is of the quicker construction speed,higher degree in safety,less disturbance on the surrounding rock and less influence on the surrounding structure than the “drill-blast” method.As for the economy,the writers hold that the cost using the TBM may be almost equal to that using the “drill-blast”method provided that the corresponding measures are adopted.Finally,the writers suggest that when the tunnel is relatively long and has complicated geological condition,the TBM method should be firstly adopted.
出处 《山西水利科技》 2000年第4期1-5,共5页 Shanxi Hydrotechnics
关键词 引黄工程 钻爆法 TBM 地下隧洞 掘进机 施工方法 TBM Method Drill and Blast Method Underground Tunnel Comparison8
  • 相关文献

同被引文献17

引证文献3

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部