期刊文献+

Construction scheme comparison with comprehensive evaluation of independent perspectives

Construction scheme comparison with comprehensive evaluation of independent perspectives
在线阅读 下载PDF
导出
摘要 Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction scheme evaluation, a construction scheme evaluation model of independent perspectives was put forward through the study and optimization of comprehensive evaluation of independent perspectives. The feasibility and rationality of the optimized method were illustrated through a case study and the evaluation results were compared between the optimized method and non-optimized method. The optimized method has the practical value in construction scheme comparison. Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction scheme evaluation, a construction scheme evaluation model of independent perspectives was put forward through the study and optimization of comprehensive evaluation of independent perspectives. The feasibility and rationality of the optimized method were illustrated through a case study and the evaluation results were compared between the optimized method and non-optimized method. The ootimized method has the nractical value in construction scheme comparison.
出处 《Journal of Chongqing University》 CAS 2013年第3期131-135,共5页 重庆大学学报(英文版)
关键词 construction scheme evaluation model independent perspective comprehensive evaluation construction scheme evaluation model independent perspective comprehensive evaluation
作者简介 YAN Xi-kang (阎西康): hbgydxyxk@163.com Corresponding author, WANG Lei (王磊): wangleil 10768@163.com.
  • 相关文献

参考文献6

二级参考文献56

共引文献256

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部