摘要
拉法基瑞安重庆永川水泥生产线项目地质状况及施工条件比较复杂,在部分基础和垫层以下填充混凝土工程施工过程中出现了裂缝现象。分析了本工程出现裂缝的原因,阐述了使裂缝得到有效控制所采取的一系列措施。
Because the geological condition and construction condition of Lafarge Chongqing Yongehuan cement pro- duction line project are complicated, some parts such as the part foundation or under the cushion layer had the cracks during the eonstrLn.tion process of filling the concrete. For solving the problem, the canses of cracks al'e analyzed, and some measures for controlling the cracks are put forward.
出处
《混凝土与水泥制品》
北大核心
2013年第10期78-80,共3页
China Concrete and Cement Products
关键词
基础工程
裂缝
控制
Foundation engineering
Crack
Controlling
作者简介
国卫生,男,高级工程师。通讯地址:北京市(亦庄)经济技术开发区隆庆街7号联系电话:010—67285218。13582659520E-mail:guoweisheng@cbmi.com.cn